Laserfiche WebLink
ANGLE COLUMN OF EXIST. PIPE <br /> I I SUPPORT FRAME, TO BE CUT I I <br /> LOOSE AND RE-CONNECTED TO <br /> NEW TUBES WHICH SPAN TO I <br /> THE NEW W21 BEAMS <br /> G.C. TO COORD. PIPE I <br /> - i SUPPORT SADDLE WITH <br /> HENDERSON <br /> I I I I <br /> I I I I <br /> I I I I <br /> I I I <br /> INLET PIPE SUPPORT TUBE i EXISTING BAR JOIST o <br /> -SEE SHEETS S8.0.1 (9-30-14) <br /> AND S&O OF IFB DRAWINGS <br /> (3-11-14) I <br /> I I I I <br /> 3/16 <br /> I I I I <br /> I I I I <br /> I I I I <br /> I I I I <br /> I I I I <br /> -----I <br /> I I I I <br /> I I I I <br /> I I I I <br /> I I I I <br /> I I I I <br /> I I I I <br /> I I I I <br /> z I I I I <br /> I I <br /> \-W2lx48 INSTALLED IN 2014 <br /> TYP. BOTH SIDES WELD TO BEAM TYP. <br /> U.N.O. AT PIPE SUPPORTS <br /> - REF. 2/S4.3 <br /> CYCLONE INLET PIPE SUPPORTS, NORTH CYCLONE INLET PIPE SUPPORTS, SOUTH <br /> (3) TUBES APPROACHING TOWER 9 2 (3) TUBES APPROACHING TOWER 9 <br /> S8.1 S8.5 1 1/2" = 1'-0" 581111S8. <br /> .1 S8.5 1 1/2" = 1'-O" <br /> DWG.NO. REFERENCE DRAWINGS I IDESCRIPTION OF REVISION DATE BY VENTILATION I ENGR: JLK 2.28.14 Climax Molybdenum HENDERSON MILL <br /> MECHANICAL DRAWN BY. JP 2-28-14 4 TAILINGS DELIVERY LINE <br /> RECORD SET OF CONSTRUCTION COMPLETED IN 2015 09-03-15 JLK STRUCTURAL CHECKED BY. JCB 2-28-14 A FrogW-IICMoRNI oa y <br /> ELECTRICAL APPROVED BY: ae­ mlm�00 n9 L CYCLONE INLET AT TOWER 9 <br /> PIPING APPROVED By: vBAUR&ASSOCIATFS SUPPORT DETAILS <br /> SCALE: AS NOTED OTHER APP BY cllx f.UtTIN9 LN11u EE 89 PROD.NO.13024 SHf S8.5 REV. 4 <br />