My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-12_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2015-11-12_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 8:12:25 PM
Creation date
11/13/2015 3:35:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
11/12/2015
Doc Name
Correspondence Re: TR22
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR22
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39'-2 1/2" 40'-4 1/2" <br /> 2•-4• 3•-r 3•-3• 3'-3- r-r r-r r-r 3'-r r-r 4•�• 4'-3• r-r Y-r 3'-31 3'-r 31-r r-3• 2'-6' 4•-0• r-r r-3• r-r <br /> .t <br /> BEAM-TO-BEAM <br /> Ld <br /> ro X-BRACE <br /> I - W21 x48 <br /> o) W21 x44 <br /> ——— i APPROXIMATE Q <br /> 4.c FINAL GRADE Nw <br /> llj <br /> all EXISTING BAR <br /> `xw ,,.,r,l:,r ; w JOIST ABANDONED c� <br /> o _j Z I w <br /> w <br /> L_ IN PLACE <br /> S2.11 S4.13 D- <br /> o J <br /> o � <br /> w <br /> o_ <br /> 5-6" 34'-6 3/8" 39'-11 3/8" <br /> 12 ELEVATED PIPE SUPPORTS, TOWER #12 <br /> 52.0 S2.12 NOTES: ,/8•• _ —O.• <br /> 1. PEDESTAL LOCATION DIMENSIONS LISTED WERE PROVIDED <br /> TO BAUR BY PRECISION INDUSTRIAL CONTRACTORS. <br /> 2. BEAM LENGTH, LOCATIONS OF PIPE SUPPORT TUBES AND <br /> BEAM—TO—BEAM X—BRACES ARE BASED ON THE STEEL <br /> FABRICATION SHOP DRAWINGS PREPARED BY CRITICAL <br /> PATH METALWORKS, DATED 08/25/14, IDENTIFIED AS <br /> SUBMITTAL 5. <br /> DWG.NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY VENTILATION I I ENGR: JLK 2-28-14 1 Pn oftffZ axMolybdenum HENDERSON MILL <br /> MECHANICAL DRAWN BY: JP 2-28-14 TAILINGS DELIVERY LINE <br /> 4 RECORD SET OF CONSTRUCTION COMPLETED IN 2015 0903.15 JLK STRUCTURAL CHECKEPPROV BY: <br /> D BV: JCB 2-28-14 A fn/pOlf-�IC►ADRM CONIfMy <br /> ELECTRICAL <br /> ELEVATION AT TOWER#12 <br /> AED <br /> PIPING APPROVED BY: BAUK 6L ASSOCIATES <br /> SCALE: AS NOTED OTHER APP BY: C -R—T......11.'F e R s PROJ.NO.13024 ISHT S2.12 REV. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.