My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-12_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2015-11-12_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 8:12:25 PM
Creation date
11/13/2015 3:35:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
11/12/2015
Doc Name
Correspondence Re: TR22
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR22
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1•-r: BEAM-TO-BEAM S2.7 S4.9 I—-------� <br /> * X-BRACE ADD WOOD BLOCKS <br /> s'- 1/2•: s•-s• s'-s• s'-s• r-r r-s 3'-r '-r ]'�S• r-S' S'-a•* IAT PEDESTAL I <br /> i — --- — — — -- — — — — <br /> I I J S2.7 S4.11 <br /> Fil— — — -- -- — — — — — <br /> w I , NO LATERAL TUBE <br /> o '" (INSTALLED AT PIPE BELL I <br /> ——— I I- I s W21x44 (INTERFERENCE I <br /> I-INSTALL LAT. TUBE AND I <br /> EXISTING BAR N EXTENDER TUBE ———J <br /> JOIST ABANDONED o <br /> f {rtin c IN PLACE a <br /> a EXISTING CONCRETE APPROXIMATE <br /> N BLOCK FINAL GRADE <br /> w <br /> OLi <br /> 8'-6" C- 32'-2 1/2" <br /> ELEVATED PIPE SUPPORTS, TOWER #7 <br /> S2.0 S2.7 NOTES: 1/8" = 1'-0" <br /> 1. PEDESTAL LOCATION DIMENSIONS LISTED WERE PROVIDED <br /> TO BAUR BY PRECISION INDUSTRIAL CONTRACTORS. <br /> 2. BEAM LENGTH, LOCATIONS OF PIPE SUPPORT TUBES AND <br /> BEAM—TO—BEAM X—BRACES ARE BASED ON THE STEEL <br /> FABRICATION SHOP DRAWINGS PREPARED BY CRITICAL <br /> PATH METALWORKS, DATED 08/25/14, IDENTIFIED AS <br /> SUBMITTAL 5. <br /> NO WORK AT TOWER #8 <br /> S2.0 S2.7 <br /> DWG.NO. REFERENCE DRAWINGS DESCRIPTION OFREVISION DATE BY VENTILATION I I E14GR: JLK 2.28.14 1 yfi",mjrf.-_MOIyb�lenumI HENDERSON MILL <br /> MECHANICAL DRAWN BY: JP 2-za14 TAILINGS DELIVERY LINE <br /> 4 RECORD SET OF CONSTRUCTION COMPLETED IN 2015 080315 JLK STRUCTURAL CHECKED BY: JCB 2-2&14 AFf"poR-YCMORm CMIY <br /> ELECTRICAL APPROVED BY: " °"H51NL0°L0fl"O° — ELEVATION AT TOWER#7 <br /> PIPING APPROVED 8Y: MA &ASSOCIATES <br /> SCALE: AS NOTED OTHER APP BY: L'^�St�t 111 pROJ.NO.13024 SHf S2.7 REV. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.