My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-12_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2015-11-12_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 8:12:25 PM
Creation date
11/13/2015 3:35:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
11/12/2015
Doc Name
Correspondence Re: TR22
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR22
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STRUCTURAL STEEL INSPECTION AND SPECIAL INSPECTION <br /> 1. All detailing, fabrication and erection shall conform to American Institute of Steel 1. All Inspection shall conform to the requirements of Section 109 of the International <br /> Construction "Specifications for Structural Steel Buildings" (AISC 360) and the "Code Building Code. All Special Inspection shall conform to the requirements of Section <br /> of Standard Practice for Steel Buildings and Bridges" (AISC 303), latest editions. All 1704 of the International Building Code. <br /> bolting shall conform to the Research Council on Structural Connections "Specification 2. The owner is required to employ inspectors and special inspectors, who shall submit <br /> for Structural Joints Using ASTM A325 or A490 Bolts" (RCSC A.1), latest edition. copies of all reports to the Owner and Engineer immediately upon receipt. <br /> 2. All steel shall conform to the following ASTM standards, unless noted otherwise: Upon completion of their scope of work, the inspectors and special inspectors <br /> All steel not otherwise shown..........ASTM A 36 shall submit a final signed report stating whether the work was, to <br /> W and WT shapes..............................ASTM A 992 the best of their knowledge, in conformance with the approved set of Contract <br /> Steel TubingASTM A 500, Grade B Steel Documents and the applicable workmanship provisions of the Building Code. <br /> """""""""""""""""""' 3. Inspectors and special inspectors shall be qualified person(s) who demonstrate <br /> Pipe......teel..bolt.....hall.....................ASTM A 53 (Type E or S), Grade B competence in their respective type of construction to the satisfaction of the Building <br /> 3. Structural steel bolts shall conform to ASTM A 325, heavy hex. Nuts shall conform Official. <br /> to ASTM A 563, heavy hex. Washers shall conform to ASTM F 436. Bolted 4. The General Contractor shall coordinate with inspectors and special inspectors to <br /> assemblies shall be 3/4'0 unless noted otherwise. incorporate the inspection schedule into the overall project construction schedule. <br /> 4. Bolted connections shall be snug tight per AISC standards, unless noted otherwise. 5. Special inspection is required for, but not limited to, the following types of work. <br /> 5. All welding shall conform to the American Welding Society "Structural Welding Code" Refer to the project specifications and the IBC for additional information regarding <br /> (AWS D1.1), latest edition. Welding shall be performed with E70xx electrodes unless testing and inspection requirements. <br /> noted otherwise. Soil preparation.....................................Table 1704.7 <br /> 6. All steel shall be shop primed and painted, with the exception of areas to be field welded. Structural concrete...............................Section 109.3.1, Section 109.3.2, Table 1704.4 <br /> See section STEEL COATINGS for additional information & requirements. Structural steel fabricator....................Section 1704.2 <br /> 7. Areas within 2 inches of field welds shall not be painted until after welding. Field Structural steel construction................Section 109.3.4, Table 1704.3 <br /> welds, bolt heads, nuts, all other surfaces not shop painted, and all surfaces that 6. The Engineer of Record shall not be considered a Special Inspector. <br /> become abraded during shipping and erection shall be field painted immediately after 7. The Engineer of Record shall be provided jobsite access to conduct quality assurance. <br /> erection. Shop connections shall be welded unless noted otherwise. <br /> 8. Shop connections shall be welded unless noted otherwise. <br /> 9. All welding shall be done by certified welding operators, who each have in their <br /> possession current evidence of passing the "American Welding Society Standard STEEL COATINGS <br /> Qualifications Tests" as detailed in AWS D1.1. Welding certificates shall be submitted <br /> to the Engineer for each welder before field welding commences. All steel shall be prepared and coated as noted in this section: <br /> 10.Weld sizes not otherwise shown shall be minimum continuous 5/16 inch fillet welds. 1. Abrasive blast steel to SSPC SP-6 Apply one primer coat of Tnemec Series 90-97 <br /> 11. Torch-based fabrication (including, but not limited to, holes, coping and trimming of Tneme-Zinc at 3.0 mils dry thickness Apply one top coat of Tnemec Series 73 <br /> steel members) shall be prohibited unless specifically coordinated with Engineer. Endura-Shield at 3.0 mils dry thickness <br /> 12.The Engineer shall be notified whenever base metal discontinuities, fit-up and 2. All steel which will be permanently buried in granular backfill materials is to be coated, <br /> alignment problems, field welding problems, or member length or hole alignment issues in addition to the materials specified above, with one coat of tar based sealant, such <br /> are identified during erection of the structure. Written clarification must be obtained as Tneme-Tar or approved equal. <br /> before proceeding with field modifications of the structural steel. <br /> 13.Non-shrink grout shall conform to ASTM C 1107, with a minimum ultimate <br /> compressive strength of 5,000 psi at the age of 28 days. <br /> 14.Substituted beam connections shall be subject to review by Engineer. Shear <br /> connections shall conform to Part 10 of the AISC "Steel Construction Manual," latest <br /> edition. Moment connections shall conform to Part 12. All substituted connections <br /> must develop the full capacity of the connections specified on the structural drawings. <br /> DWG.NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY VENTILATION I ENGR: JLK 2.28-11 1�C11maxMolybdenum HENDERSON MILL <br /> MECHANICAL DRAWN BY: JP 2.20.14 TAILINGS DELIVERY LINE <br /> 4 RECORD SET OF CONSTRUCTION COMPLETED IN 2015 09 3-15 JLK STRUCTURAL CHECKED BY: JOB 2.28-14 A Report-AkAZ an c.= STEEL AND SPECIAL INSPECTION <br /> ELECTRICAL APPROVED BV: ur e 1 <br /> PIPING APPROVED BY: BAUR&ASSOCIATES NOTES <br /> SCALE: AS NOTEDI OTHER APP BY: 1.TI�4 1.1.+i1-- PROJ.NO.13024 ISHT $0.3 REV. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.