GENERAL. NOTES 11. Deviations from these Contract Documents are not permitted, unless coordinated with
<br /> the Engineer.
<br /> DESIGN CRITERIA
<br /> 12.Third Party Quality Control: Contractor shall provide Engineer with copies of all third
<br /> Reference Code: International Building Code (IBC), 2009 Edition party structural field observation reports and test results immediately upon receipt.
<br /> Location: Empire/Parshall, CO 13.Third Party Engineered Systems: All references to "Professional Engineer" or "P.E."
<br /> County. Grand County shall be taken to mean a Professional Engineer currently registered in the project's
<br /> Occupancy Category. II jurisdiction with experience in the specific discipline of the engineered system.
<br /> 14.Construction documents are copyrighted and shall not be reproduced without written
<br /> Pipe Loads: 360 RCP 630 plf outhorizatioh from the Engineer & Owner.
<br /> Tailing Slurry, Full Pipe 700 plf 15.Items requiring review by the Engineer, such as shop drawings, product substitutions,
<br /> Ground Snow, Pg 70 psf, 490 plf requests for field observations, etc., shall be brought to the Engineer's attention with
<br /> sufficient notice to allow the Engineer a reasonable review period.
<br /> Wind: Velocity (3 sec. gust) 90 mph 16.The Engineer's scope of services does not include design and/or analysis of conditions
<br /> Exposure C resulting from Contractor errors or changes, nor does it include review of reissued
<br /> Net lateral load 150 plf submittals that were originally rejected. In these cases, the Contractor shall be
<br /> subject to reimbursing the Owner for additional services incurred by the Engineer.
<br /> GENERAL CONDITIONS AND REQUIREMENTS 17.Do not scale drawings.
<br /> 18.Where discrepancies exist among Drawings, General Notes, and other project documents,
<br /> 1. The use of these drawings constitutes a contractual agreement between the Contractor the most stringent requirements shall govern.
<br /> and the Owner. Thus, these Contract Documents take precedence over trade practices
<br /> and third party specifications. Refer to the Henderson Mine Scope of Work document,
<br /> titled TDL Structural Support Refurbishment, for additional information and requirements. SUBMITTALS
<br /> 2. The term "Engineer" shall be taken to mean the Structural Engineer of Record. Third
<br /> party entities are specifically noted as "Professional Engineer," "Contractor's Engineer," 1. General Contractor shall check and stamp all shop drawings before submitting to
<br /> "Designer," etc. Engineer. Unchecked submittals and/or submittals that substantially deviate from the
<br /> 3. Contractor is responsible for obtaining access to all codes, standards, specifications, Contract Documents will be returned without review.
<br /> reports, third party literature, etc. referenced in these documents. 2. As a minimum, shop drawings shall include comprehensive layouts, member sizes,
<br /> 4. Contractor shall field measure and verify all existing conditions and dimensions at job fabrication requirements and connections as required to demonstrate a complete
<br /> site. In the event that existing conditions or dimensions vary from those shown on understanding of the structural system to be constructed. Refer to individual material
<br /> the drawings, Contractor shall notify the Engineer so proper adjustments can be made. general notes for additional requirements.
<br /> 5. Contractor shall check and verify all dimensions and other information shown on the 3. Product catalog pages and reproductions of Contract Documents do not demonstrate
<br /> structural drawings. Contractor shall notify the Engineer of any discrepancies within the the required understanding of the structural intent, and will be returned without review.
<br /> structural drawings. Where such discrepancies occur, the most stringent requirements 4. General Contractor shall submit shop drawings and proprietary documentation in a
<br /> shall govern unless written clarification is obtained from the Engineer. timely manner to permit minimum ten working days for review by Engineer.
<br /> 6. All Contractors, Subcontractors, Fabricators, Suppliers and other jobsite personnel shall Contractor shall coordinate construction schedule to account for correction of errors
<br /> at all times comply with the Occupational Safety and Health Administration (OSHA) and resubmittals, if required.
<br /> Standards — 29 CFR, Parts 1910 ("Occupational Safety and Health Standards") and 5. Engineer's review of shop drawings does not relieve Contractor of responsibility to
<br /> 1926 ("Safety and Health Regulations for Construction"), as well as all MSHA requirements. follow all requirements of the Contract Documents.
<br /> 7. Drawings represent a finished product, and do not address the means and methods 6. General Contractor shall submit in writing any requests to modify the Contract
<br /> necessary to complete the construction. During erection of the structure, the Documents. Such requests shall not be considered accepted until they have been
<br /> Contractor shall be responsible for temporary bracing to withstand all loads to which specifically addressed by the Engineer. Shop drawings alone do not constitute "in
<br /> the structure may be subjected, including lateral loads, stockpiles of materials and writing", unless specific proposed changes are clearly identitied. Proposed changes
<br /> equipment. Such bracing shall be left in place as long as required for safety, and shall be coordinated by the individual initiating the change.
<br /> until all structural framing systems are in place with connections complete.
<br /> 8. The term "provide" as used herein shall mean that Contractor shall furnish and
<br /> install sold item, including all construction, equipment, materials, etc., for a complete,
<br /> finished installation.
<br /> 9. Installation of proprietary products shall comply with all manufacturer's specifications
<br /> and recommendations, unless noted otherwise. Product substitutions shalt be subject
<br /> to Engineer's review.
<br /> 10.Details provided shall apply to all comparable conditions. Where no specific details
<br /> are shown, construction shall conform to the comparable work defined elsewhere on
<br /> the project.
<br /> DWG.NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY VENTILATION I I ENGR: JLK 2-28-14 1 O%sf—tOCMOlybdenum HENDERSON MILL
<br /> MECHANICAL DRAWN BY: JP 2-28.14 — i TAILINGS DELIVERY LINE
<br /> 4 RECORD SET OF CONSTRUCTION COMPLETED IN 2015 09-03-15 1 JLK STRUCTURAL CHECKED BY: JCB 2-2&14 A Fr**pW-A4~M CONIF/IIy
<br /> ELECTRICAL APPROVED BY: '��"s"N� ""�"" GENERAL NOTES
<br /> PIPING I APPROVED BY: BAUR&ASSOCIATES
<br /> SCALE: AS NOTED OTHER APP BY: 6Va1"[F Fs PROJ.NO.13024 SHr S0.1 REV. 4