My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-10_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2015-11-10_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:27 PM
Creation date
11/12/2015 9:47:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
11/10/2015
Doc Name
Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR168
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # MR168AOI Page 1 of 2 <br />Task description: <br />Site: Deserado Mine <br />SCRAPER TEAM WORK <br />Recontouring the Haul Road/County Road 65 Intersection <br />Permit Action: MR 168 Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: MR168AOI State: Colorado <br />Date: 11/10/2015 County: Moffat <br />User: CCW <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Abbreviation: None <br />Filename: C018-MR168AOI <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraner Work Team Sunnort F,auinment Maintenance F,auinment <br />Scraper <br />Dozer Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: 100 <br />NA NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: $107.02 <br />NA NA <br />NA <br />NA <br />NA <br />Operating cost/hour: $239.91 <br />NA NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: NA <br />NA NA <br />NA <br />NA <br />NA <br />Operator cost/hour: $33.56 <br />NA NA <br />NA <br />NA <br />NA <br />Unit Subtotals: $380.50 <br />NA NA <br />NA <br />NA <br />NA <br />Number of Units: 1 <br />0 0 <br />0 <br />0 <br />0 <br />Group Subtotals: Work: <br />$380.50 Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $380.50 <br />MATERIAL OUANTITIES <br />Initial volume: 3,900 CCY Swell factor: 1.060 <br />Loose volume: 4,134 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraner Bowl (volume) Basis <br />Material weight: <br />3,250 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Gravel - Pitrun <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />25.11 LCY <br />Adjusted Capacity: <br />25.11 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.