My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-06_INSPECTION - C1981022
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981022
>
2015-11-06_INSPECTION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:21 PM
Creation date
11/9/2015 8:21:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Inspection
Doc Date
11/6/2015
Doc Name
Inspection Report
From
DRMS
To
Oxbow Mining, LLC
Inspection Date
10/28/2015
Email Name
LDS
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 28, 2015 C-1981-022/Elk Creek Mine LDS <br />GENERAL MINE PLAN COMPLIANCE: <br />TR -76 is in progress. The Division sent an initial adequacy review letter on October 23, Oxbow's response <br />to which was received by the Division on November 3. <br />MR -107 was submitted on October 22. The MR updates the permit with borehole reclamation <br />information, but also proposes the MSHA approved plan to cap and seal the vent shafts. The contractor, Rundle <br />Construction, was on site and ready to begin the work. <br />Both TR -76 and MR -107 are awaiting a final supervisor check before they are officially approved. <br />ROADS — Rule 4.03; Construction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and Maintenance <br />4.03.1(5) and (6)/4.03.2(5) and (6); Reclamation 4.03.1(7)/4.03.2(7): <br />Roads were generally in good condition. The road from Hubbard Creek around the hillside to Bear Creek <br />was not inspected. Currently it is believed to be blocked by a locked gate which will need to be cut before access <br />is possible. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />DEMCO of Buffalo, NY, have been contracted to do the structure demolition at the Elk Creek mine. At <br />the time of the inspection they were in the process of cutting up the conveyor that had been damaged by fire. Their <br />tentative schedule is to demolish the silos in February and to be off site in April of 2016. <br />DOCUMENTS RECEIVED <br />n/a <br />OTHER (SPECIFY) <br />n/a <br />ENFORCEMENT ACTIONS/COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.