My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-06_REVISION - P2013002
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2013002
>
2015-11-06_REVISION - P2013002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:36:19 AM
Creation date
11/6/2015 4:32:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2013002
IBM Index Class Name
REVISION
Doc Date
11/6/2015
Doc Name
NOI MD01
From
Dawson Gold Project
To
DRMS
Type & Sequence
MD1
Email Name
TC1
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />The targe area is rugged mountain with minimal topsoil, less than four inches in areas of <br />interest. Drilling in existing mountain trail and drill pads will minimize disturbance to <br />forested areas. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Drill holes will be backfilled with materials removed from the hole and securely plugged. In <br />-• • •1 •yy. - - •t - -• - • • • - 'Y •- • 1••-• T► - - • •1 • <br />bentonite gel as required by the Rules. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Upon completion of exploration, surface material will be distributed and graded with a <br />• • - • • - • " • • • • • • • • • . • <br />by US BLM and the Division. <br />• . • • • VI <br />1 • - -• <br />1 1 . Describe how roads will be reclaimed or returned to their pre -prospecting (or better) condition: <br />The proposed exploration will rely on existing roads, both public and private. <br />
The URL can be used to link to this page
Your browser does not support the video tag.