My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-06_REVISION - P2013002
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2013002
>
2015-11-06_REVISION - P2013002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:36:19 AM
Creation date
11/6/2015 4:32:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2013002
IBM Index Class Name
REVISION
Doc Date
11/6/2015
Doc Name
NOI MD01
From
Dawson Gold Project
To
DRMS
Type & Sequence
MD1
Email Name
TC1
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Core hole drilling will originate from existing drill pads in Windy Gulch (Pad #4) and Dawson <br />Mountain (Pad #5). Drill pads will be accessed via existing mountain roads. Holes will be <br />pluggcd upon completion of exploration. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 2.00 Average Width 90.00 (ft) Average Length 85.00 (ft) <br />B. Drill Holes: Quantity 10.00 Depth 500.00 (ft) Diameter 4.00 (in) <br />C. Mud Pits: Quantity 10.00 Average Width 5.00 (ft) Average Length 5.00 (ft) <br />Average Depth 3.00 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />Mud pits and drill pads will be reclaimed upon completion of exploration. Borehole <br />ri ogs wi s e provise. o e P 'vision in accorance wi ' u e as require. or <br />F. Other Disturbances (please describe): <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />Chemicals will not be used during exploration. Diesel fuel will be used by the drill rig and <br />will be hauled to the site as needed. <br />F. New Road(s): Length 0.00 (ft) Width (ft) <br />Significantly Upgraded Road(s) Length 0.00 (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />NA <br />
The URL can be used to link to this page
Your browser does not support the video tag.