Laserfiche WebLink
Midway Aggregates, RLLP <br />Main Office: P.O. Box 580 • Rye, CO 81069 Plant: P. 0. Box 307 • Holly, CO 81047 <br />Phone: (719)489-3385 • Fax (719)489-2268 Phone: (719)537-0117 • Fax (719)537-0115 <br />Colorado Division of Reclamation, Mining & Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Attn. Timothy A. Cazier <br />November 4, 2015 <br />RECEIVED <br />NOV 0 6 2015 <br />Re: Request for extension on Corrective Actions <br />- Permit # M-1-993=05 DIVISION OF RECLAMATION <br />MI�N,H,� p 10�3$_010 MINING&SAFETY <br />Mr. Cazier 60/L c rttftR D COPY 4, it j <br />7G-! <br />Midway Aggregates, RLLP is requesting a 6 month extension regarding the Corrective <br />actions noted on the inspection report you signed on October 7, 2015. The reason for <br />the extension request is the difficulty we are having determining just who is the owner <br />let alone contacting the correct person at the power company regarding the agreement <br />mentioned in Inspection Topic No. 2. <br />Additional time is also needed to evaluate the financial warranty and technical revision <br />requests. It would require us to take critical personnel off our startup of two winter <br />projects both to address the engineering required for the technical revision and to <br />determine if the costs the Division proposes for additional financial warranty are <br />realistic. <br />This area has not been mined for over five years and only a small amount of stockpiled <br />material has been removed. <br />Please contact me at 719-489-3385 with any questions or concerns. <br />Respectfully, <br />Midway Aggregates, RLLP <br />_r <br />Leonar ead <br />O 719-489-3385 <br />C 480-406-7725 <br />leonard@kirklandconstruction.us <br />Equal Opportunity Employer <br />