Laserfiche WebLink
PERMIT#: M-Iy81-18:) <br />INSPECTOR'S INITIAL: UNIC <br />INSPECTION DATE: Oetobe. LL_ LU IJ <br />May Day 1 Area <br />Evidence of a„y .ereia activity Was not observed in this area. Activities approved through TR -1 have beci, completed. <br />The portal is secured with a locked gate. Wi,e mrah and pock bolts used to stabilize the highwall above the portal appea, <br />to be fuixtiuning effectively. The mill portal door was locked during this im5purtion. The milling equipment that was <br />removed from the collapsed ...ill portal is atilt located on the May Day 1 pad. The four storage containers mid various <br />refuse anu debris are still located in this area. <br />Figure 14: May Day 1 area <br />t'iguic 16: May Uay I highwall <br />Piguie 15: May Day 1 area <br />Figuwe 1 /: May Uay I P01 till <br />rage 7 of 9 <br />