My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-15_REVISION - M2008080
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008080
>
2015-09-15_REVISION - M2008080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:10 PM
Creation date
11/4/2015 4:12:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
Revision
Doc Date
9/15/2015
Doc Name
Bond Calculations/Phasing Plan TR02
From
JT
To
DRMS
Type & Sequence
TR2
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UT Consulting, Inc. Journey Ventures, LLCFReclamati! Journey Ventures Pi9/8!2015 <br />Bond Quantities and Costs <br />tvygconsaitin& Ina <br />Phase 11 (10.90 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Minima Area <br />Credit for Slurry Wall Required to Close Phases 3-10 7,501) If 310.00 2,325,310) <br />Slurry Wall Required to Close Phases 3-11 (All Phases) 7,722 ff 310.00 2,393,820 <br />Credit for Overburden Placement Required to Close Phase 3-10 222,252) cy 2.25 500,067) <br />Overburden Placement Required to Close Phase 3-11 228,800 cy 2.25 514,800 <br />Credit for Scarifying Disturbed Area Phase 11 A 2.15) ac 200 430) <br />Scarifying Disturbed Area Phase 11 328 ac 200 656 <br />Credit for Topsoil Placement Disturbed Area Phase 11A 2.15) ac 1,800 3,870) <br />Topsoil Placement Disturbed Area Phase 11 3.28 ac 1,800 5,904 <br />Credit for Revegetate Disturbed Area Phase 11A 2.15) ac 1,000 2,150) <br />Revegetate Disturbed Area Phase 11 3.28 ac 1,000 3,280 <br />Dewatering Required for Phase 11 Area 217 Mil Gal 400.00 86,868 <br />Total Direct Cost 173,501 <br />Overhead and Profit Cost (12.60%) $ 21,861 <br />Contract Cost $ 195,363 <br />Project Management (9.25%) $ 18,071 <br />Additional Financial Warranty Required For Phase 11 $ 213,434 <br />Cummulative Financial Warranty Required For Phases 1, 11A, 2-11 $ 4,121,762 <br />6of6
The URL can be used to link to this page
Your browser does not support the video tag.