My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-15_REVISION - M2008080
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008080
>
2015-09-15_REVISION - M2008080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:10 PM
Creation date
11/4/2015 4:12:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
Revision
Doc Date
9/15/2015
Doc Name
Bond Calculations/Phasing Plan TR02
From
JT
To
DRMS
Type & Sequence
TR2
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 8, 2015 <br />I/ SEP I ,:, 20,15 <br />DIVISION OF RECLAMATION <br />MINING AND SAI:ETY <br />Mr. Peter Hays <br />Environmental Protection Specialist <br />State of Colorado <br />Division of Reclamation, Mining, & Safety <br />1313 Sherman Street — Room 215 <br />Denver, CO 80203 <br />7R05A <br />RE. Journey Ventures, LLC. - Journey Ventures Pit - Technical Revision No. 2 Request, <br />File No. M-2008-080, Bond Calculations and Updated Mine Phasing Plan <br />Dear Mr. Hays, <br />Journey Ventures, LLC requests a revision to their existing permit to address the following 2 <br />items: <br />1. Exhibit C - Pre-Mining/Mining Plan <br />a. Revision of the mine phasing. <br />2. Exhibit L - Reclamation Costs <br />a. Revision of the financial warranty required for the reclamation of each phase of <br />mining. <br />Detailed descriptions of these revisions are in the following sections. <br />Exhibit C - Pre-Mining/Mining Plan <br />Revision of mine phasing <br />Phase 7 will be mined to a depth to achieve 125,000 cubic yards which is roughly 27 feet <br />deep and the reclamation will be backfilling Phase 7 to an elevation 2 feet above the <br />groundwater (elevation 4592) table. There is currently 40,000 cubic yards of overburden that <br />will be used to backfill Phase 7 once the 125,000 cubic yards of aggregate materials are <br />mined. The other phases that are impacted are as follows: <br />1. Surface mining of the top 5 feet of material to an elevation 2 feet above the <br />groundwater (elevation 4592) table of the Phase 1 area which produces 45,000 cubic <br />yards to backfill Phase 7. <br />2. Surface mining of the top 8 feet of material to an elevation 2 feet above the <br />groundwater (elevation 4597) table of the Phase 11A area which produces 20,000 <br />cubic yards to backfill Phase 7. <br />3. The scarifying, topsoil placement, and seeding of disturbed areas in Phase 1, Phase <br />2, Phase 11A, and Phase 7. <br />V l 305 Denver Avenue — Suite D - Fort Lupton CO 80621 • Ph: 303-857-6222 • Fax: 303-857-6224
The URL can be used to link to this page
Your browser does not support the video tag.