My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-03_HYDROLOGY - M1982131
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1982131
>
2015-11-03_HYDROLOGY - M1982131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:14 PM
Creation date
11/4/2015 3:23:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982131
IBM Index Class Name
HYDROLOGY
Doc Date
11/3/2015
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table No. 4 <br />Bucklen Equipment Company, Inc. <br />Bucklen Pit (M-1982-131) <br />WY 2015 Estimated GIC Subsurface Return Flow Obligations <br />Applegate <br />Group, Inc. <br />Date Revised: 9/23/2015 <br />AG Job #: 08-127 <br />WY 2015 <br />Month <br />GIC Direct Flow <br />Fossil Creek Reservoir <br />GIC Direct <br />Subsurface <br />Return Flow <br />Factor <br />(A) <br />GIC Direct <br />Subsurface <br />RF Obligation <br />[ac -ft] <br />(B) <br />Fossil Creek <br />Subsurface <br />Return Flow <br />Factor <br />(C) <br />Fossil Creek <br />Subsurface <br />RF Obligation <br />[ac -ft] <br />(D) <br />November <br />2.1% <br />1.19 <br />2.0% <br />0.02 <br />December <br />2.0% <br />1.13 <br />1.8% <br />0.02 <br />January <br />1.8% <br />1.02 <br />1.7% <br />0.02 <br />February <br />1.7% <br />0.96 <br />1.6% <br />0.02 <br />March <br />1.6% <br />0.90 <br />1.5% <br />0.01 <br />April <br />1.5% <br />0.85 <br />1.4% <br />0.01 <br />May <br />1.8% <br />1.02 <br />1.3% <br />0.01 <br />June <br />2.1% <br />1.19 <br />1.2% <br />0.01 <br />July <br />2.3% <br />1.30 <br />1,5% <br />0.01 <br />August <br />2.4% <br />1,35 <br />2.4% <br />0.02 <br />September <br />2.4% <br />1.35 <br />2.5% <br />0.02 <br />October <br />2.3% <br />1.30 <br />2.1% <br />0,02 <br />Total <br />24.0% <br />13.55 <br />21.0% <br />0.21 <br />Water Year <br />Total Annual Delivery [ac -ft] <br />Remarks <br />GIC Direct Flow <br />Fossil Creek Reservoir <br />2011 <br />34.20 <br />0.00 <br />Based on SWSP accounting <br />2012 <br />97.92 <br />0.00 <br />Based on SWSP accounting <br />2013 <br />68.68 <br />0.26 <br />Based on SWSP accounting <br />2014 <br />26.66 <br />0.00 <br />Based on SWSP accounting <br />2015 <br />54.77 <br />4.74 <br />Based on actual and projected deliveries <br />Average <br />56.44 <br />1.00 <br />Notes: <br />(A) Monthly subsurface return flow factors per Poudre Prairie Decree <br />(B) Equals Column (A) multiplied by the average total annual delivery of GIC direct flow water <br />(C) Monthly subsurface return flow factors per Poudre Prairie Decree <br />(D) Equals Column (C) multiplied by the average total annual delivery of Fossil Creek Reservoir water <br />N:\08127 Bucklen Pit Augmentation\Disciplines (Technical)\Water Rights\SWSP\WY 2016\Bucklen Pit 2016.xlsx <br />
The URL can be used to link to this page
Your browser does not support the video tag.