Laserfiche WebLink
September 21, 2015 mr. rrallace Erickson <br />rage 3 ql 3 <br />13KMI will submit proof of publication to the uuKMJ. <br />BKM1 believes that all appl;cable portions of the Reclamation Plan requiremeuts have been <br />satisfied in accordance with the Act and Mineral Rules and Regulations for Hard Kock, Metal; <br />and Designated Mining Operations for the 716.55 aces requested to be removed trom the permit <br />area. <br />Should additional intormation be required OL any clarifications are necessary, please contact me <br />at (719) 37Y-0538. <br />Sincerely, <br />J lio Madrid <br />Project Manager <br />Battle Mountain Resources, Inc. <br />Enclosures: hxhibit 1 <br />cc: Larry Fiske, Newmont USA Limited <br />uavid Uefiilin, Newmont USA Limited <br />Tim Runneils, AtS <br />t3MRJ rile <br />