My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-30_HYDROLOGY - C1981008
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981008
>
2015-10-30_HYDROLOGY - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:05 PM
Creation date
11/2/2015 1:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Hydrology
Doc Date
10/30/2015
Doc Name
4th Quarter 2015 Impoundment Inspection Report
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4th QUARTER POND EXAMINATION FORM <br />Mine: New Horizon 2 Mine <br />Pond Name: Pond 007 <br />NPDES Permit & Outfall #s: CO -0000213 <br />Date Examined: 16 -October -2015 <br />Location Description: One mile West of Nucla <br />Circle or Write appropriate Response <br />Owner's Rep.: Rick Wolney, Mine Manager <br />Pond Type: Partly Incised <br />CD R M & S #: C-1981-008 <br />Date Last Examined: 23 -July -2015 <br />Legal Location: Sec 6 of T46N R15W <br />Inspector's Name: Frank Ferris <br />1. Seepage (specify location, color, and approx. volume) Yes PA N/A <br />2. Cracks or scarps on crest or slopes Yes Nib N/A <br />3. Sloughing or bulging on slopes Yes 6 N/A <br />4. Major erosion problems Yes N/A <br />5. Surface movements in valley bottom or on hillside Yes N/A <br />6. Water impounded against toe Yes N/A <br />7. Clogging <br />a) Spillway channels and pipes Yes rg N/A <br />b) Decant system Yes If, <br />N/A <br />C) Diversion Ditches Yes Nla N/A <br />8. Cracking or crushing of pipes (� <br />a) Spillway pipes Yes MA N/A <br />b) Decant system Yes (C,f�iq� N/A <br />9. Trash racks clear and in place )62 No N/A <br />10. Monitoring instrumentation is in place and functioning 1( No N/A <br />Comments: p <br />U S rpt f " �j1, o % e �,l 1 e ��C /0 <br />/0 / <br />F:\M\NHN\Environmental\Pond Inspections & Examinations\2015_10 4`h Quarter Pond Examinations.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.