My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-29_PERMIT FILE - M2015043
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015043
>
2015-10-29_PERMIT FILE - M2015043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:03 PM
Creation date
10/30/2015 9:45:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015043
IBM Index Class Name
PERMIT FILE
Doc Date
10/29/2015
Doc Name
Is It Mining Questionnaire
From
David McHugh
To
DRMS
Email Name
MAC
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Will the extracted material be hauled offsite or used on the same parcel of property where the <br />material is extracted? Material will be hauled off site <br />6. How will the extracted material be used on site? Occassional hand grinding of samples <br />7. If the material is hauled offsite, where will it be hauled to and what it the intended use? <br />1 am looking for property in the Florissant area to construct a cabin & shop, will also use <br />residence in Texas. After extracting any gold, remainder will be mixed with cement <br />and use to form shop floor, driveway, or deck. <br />8. What is the approximate areal extent of the proposed extraction in acres? 1/10th acre on tailings pile <br />9. To what approximate depth will the extraction extend? Unknown, mine is currently plugged <br />10. In cubic yards. approximately how much material Nvi1I be reproved? <10 cu yrds annually <br />11. Will material extraction involve the use of explosives? No <br />12. Will site of extraction result 111 the exposure of tributary ground water? No <br />13. Will either the landowner or the mine site operator receive any type of compensation. i.e.. <br />monetary. in-kind. Haulage fees. etc.. from the proposed material extraction? No <br />14. Please supply a copy of any documents that will ensure that the area of extraction will be <br />reclaimed to some beneficial land use once extraction activities have been completed. <br />USFS Plan of Operations attached <br />15. Do you have permits for this activity from any other governmental agencies such as building. <br />construction. orgrading permits. and if so. what are they <br />?USFS Plan of Operations attached. <br />16. Are there state federal local agency participants in tenus of hauling ( 1 -(no), design ( Hilo) <br />What are the percentages? <br />17. What post mining uses will be made of the site of extraction and why? Public recreational use of <br />(This question helps us determine the intent of the activity) USFS ORV area <br />18. \Vhat types and sizes of equipment will be used in the extraction? Small hand tools, 8000 watt <br />generator, 3cfm compressor <br />
The URL can be used to link to this page
Your browser does not support the video tag.