My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-29_PERMIT FILE - M2015043
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015043
>
2015-10-29_PERMIT FILE - M2015043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:03 PM
Creation date
10/30/2015 9:45:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015043
IBM Index Class Name
PERMIT FILE
Doc Date
10/29/2015
Doc Name
Is It Mining Questionnaire
From
David McHugh
To
DRMS
Email Name
MAC
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Bond. Reclamation of all disturbances comlected with this plan of operations is covered by <br />Reclamation Peifolmance Bond No. , dated t>mrd,;,:) . signed by (Principal) <br />and (Suu-ety). foi the penal sum of . This Reclamation Perfonnance Bond is a <br />guarantee of faithful performance Nyith the terms and conditions listed below, and with the <br />reclamation requirements agreed upon m the plan of operations. This Reclamation Performance <br />Boncl also extends to and includes any Uulauthorized activities conducted in connection with this <br />operation. <br />The bond amount foi this Reclamation Performance Bond was based on a bond calculation <br />worksheet. The bond amount may be adjusted dining the term of this proposed plan of <br />operations m response to changes in the operations 01 to changes m the economy. Both the <br />Reclamation Performance Bond and the bond calculation worksheet are attached to and made <br />part of this plan of operations. <br />Acceptable bond securities (subject to change) include: <br />1. Negotiable Treasury bills and notes which are unconditionally guaranteed as to both principle <br />and interest in an amount equal at their par value to the penal sum of the bond: or <br />2. Certified or cashier's check. bank draft. Post Office money order. cash. assigned certificate of <br />deposit. assigned savings account. blanket bond. or an irrevocable letter of credit equal to the <br />penal snum of the bond. <br />VII. TERMS AND CONDITIONS <br />A. If a bond is required. it unlst be filrushed before approval of the plan of operations. <br />B. Information provided with this plan marked confidential will be treated in accordance with the <br />agency's laws. Hiles. and regulations. <br />C'. Approval of this plan does not constitute certification of ownership to any person named herein <br />and or recognition of the validity of any mining claim named herein. <br />D. Approval of this plan does not relieve me of nnv responsibility to comply with other applicable <br />state or federal laws. rules. or regulations. <br />E. If previously undiscovered cultural resources (historic or prehistoric objects. artifacts. or sites) <br />are exposed as a result of operations. those operations will not proceed until notification is <br />received from the Authorized Officer that provisions for mitigating unforeseen impacts as <br />required by 36 CFR 228.-1(e) and 36 CFR 800 have been complied with. <br />F. This plan of operations has been approved for a period of or Until 0?:r7 da,g, . A new <br />or revised plan Bust be submitted in accordance with 36 CFR part 228, subpart A. if operations <br />are to be continued after that time period. <br />flf more space is needed to fill out a block of information, use additional sheets and attach form) <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.