Laserfiche WebLink
New Elk Mine <br />Indications of Potential Failure or Instability: <br />None observed. <br />Threat to Human Life or Property: <br />None observed. Location and placement minimize potential impacts to life or property. <br />Potential Harm to Land, Air, and Water Resources: <br />None observed. Location of the waste bank minimizes potential impacts to land and water resources, <br />but failure could impact State Highway 12 and the Purgatoire River. <br />Maintenance Required: <br />The facility is in good early fall condition. <br />Supporting Documentation: (Compaction tests, surveys, photographs, field measurements). <br />Compaction testing was last done by New Elk Coal personnel in June 2015. Due to limited refuse <br />placement, compaction testing was not done this quarter. CTL -Thompson, a Geotechnical Consulting <br />Company has been contacted to schedule compaction test in the fouth quarter prior to frozen ground. <br />Well <br />Depth <br />Elevation <br />TH-1 <br />44.6 ft <br />7440.30 <br />TH-2 <br />70.1 ft <br />7461.90 <br />TH-3 <br />96.6 ft <br />7497.70 <br />Inspector <br />6 �/.� <br />Date <br />Page 2 of / 2. <br />lt;upeising P.E. ; <br />Date <br />