Laserfiche WebLink
6.0 Inspection and Maintenance <br />This section provides a description of the procedures to inspect and maintain the vegetation, <br />erosion and sediment control measures and other BMPs identified in this construction SWMP. in <br />accordance with the permit requirements, the entire stormwater management system will he inspected <br />every 14 days during mining activities and after any significant precipitation or snowmelt event that causes <br />significant erosion. The BMPs will he maintained in goad and effective operating condition during mining <br />activities. <br />During Mining and hauling activities at the site, silt fences (if used) ditches (where present) will <br />be inspected for excessive sediment buildup that may infringe on the freeboard. if such excessive sediment <br />buildup occurs, the sediment will be removed, as necessary. The stability of silt fences will be inspected <br />for proper anchorage at the base, for verticality of the fence supports and for fabric tears or rips. <br />Appropriate repairs will he made as necessary if significant problems are noted. Inspections, testing, and <br />preventive maintenance will be performed on all site equipment and operational systems. This program will <br />aim toward prevention of failures by adjustment, repair or replacement of site equipment and /or structures. <br />All excavating and hauling equipment will be regularly inspected and maintained. <br />The administrators for the SWMP at this site will be Mr. Scott Brennise, owner of land parcel and 413 Land <br />& Livestock LLC, and a designated contract operator employee. They will be responsible far the <br />development, implementation, maintenance and revision of this SWMP. <br />WestWater Engineering APPENDIX C - 46 July 2012 <br />