My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-27_REPORT - M2008022
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2008022
>
2015-10-27_REPORT - M2008022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:58 PM
Creation date
10/28/2015 9:03:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008022
IBM Index Class Name
REPORT
Doc Date
10/27/2015
Doc Name
Proposed Mitigation Plan
From
WestWater Engineering for Elam Construction, Inc.
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 inspection and Maintenance <br />This section provides a description of the procedures to inspect and maintain the vegetation, <br />erosion and sediment control measures and other BMPs identified in this construction SWMP. in <br />accordance with the permit requirements, the entire stormwatcr management system will be inspected <br />every 14 days during mining activities and after any significant precipitation or snowmett event that causes <br />significant erosion. The F3MPs will he maintained in good and effective operating condition during mining <br />activities. <br />During Mining and hauling activities at the site, silt fences (ifused) ditches (where present) will <br />he inspected for excessive sediment buildup that may infringe on the freeboard. If such excessive sediment <br />buildup occurs, the s:dimcnt will be removed, as necessary. The stability of silt fences will he inspected <br />for proper anchorage at the base. for verticality of the fence supports and for fabric tears or rips <br />Appropriate repairs will be made as necessary if significant problems are noted. inspections, testing, and <br />preventive maintenance will he performed on all site equipment and operational systems. This program will <br />aim toward prevention of failures by adjustment, repair or replacement of site equipment ani for structures <br />All excavating and hauling equipment will be regularly inspected and maintained. <br />The administrators for the SWMP at this site will be Mr. Scott Brennise, owner of land parcel and 4B Land <br />& Livestock LLC, and a designated contract operator employee. They will be responsible for the <br />development, implementation, maintenance and revision of this SWMP. <br />WestWater Engineering APPENDIX C - 31 July 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.