My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-27_REPORT - M2008022
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2008022
>
2015-10-27_REPORT - M2008022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:58 PM
Creation date
10/28/2015 9:03:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008022
IBM Index Class Name
REPORT
Doc Date
10/27/2015
Doc Name
Proposed Mitigation Plan
From
WestWater Engineering for Elam Construction, Inc.
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(g) Identify the primary and secondary commodities to be mined andlor extracted <br />and describe the intended use. <br />The primary commodities to be mined andlor extracted are s rock/cobbles and <br />gravel/sand to be crushed for road surfaces and backfill material and asphalt <br />additives. In addition to crushed rock material some straight pit run and base <br />fill material may be produced without processing through a crusher spread. <br />Occasional largdr rock, cobble and boulders, for drainage rock or landscape <br />decorative use may be produced and stockpiled. <br />(h) Name and describe the intended use of all expected incidental products to be <br />mined and/or extracted by the proposed operation. <br />Products to be mined and/or extracted by the proposed operation will be: Rock <br />sand and gravel for crushed rock for use as base grade, backfill, and rock for <br />concrete and asphalt material additives. Pit run and fill materials for sub - <br />grade backfill and base grade use. Graded rock, sand and gravel for base fill <br />and drainage fill type material. The intended use of these materials will be as <br />various graded construction aggregates, asphalt additives and base course and <br />fill material for road construction projects and general construction. <br />WestWater Engineering <br />APPENDIX C - 10 July 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.