My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-27_REPORT - M2008022
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2008022
>
2015-10-27_REPORT - M2008022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:58 PM
Creation date
10/28/2015 9:03:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008022
IBM Index Class Name
REPORT
Doc Date
10/27/2015
Doc Name
Proposed Mitigation Plan
From
WestWater Engineering for Elam Construction, Inc.
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 7. Wetland Mitigation Construction Costs <br />Item <br />Description <br />Quantity <br />Units <br />Unit Cost <br />Total Cost <br />7B <br />Furnish Cottonwood Poles; <br />includes labor, scoping and <br />material to harvest and deliver to <br />project site <br />450 <br />EA <br />$66.00 <br />$29,700.00 <br />7C <br />Installation of woody vegetative <br />material - includes labor and <br />equipment <br />40 <br />HR <br />$300.00 <br />$12,000.00 <br />8 <br />Seed Mix <br />8A <br />Wetland Seed Mix - furnish and <br />broadcast seed mix <br />3 <br />AC <br />$400.00 <br />$1,280.00 <br />8B <br />Transition Seed Mix - furnish and <br />broadcast seed mix <br />1 <br />AC <br />$60.00 <br />$84.00 <br />8C <br />Upland Seed Mix - furnish and <br />broadcast seed mix <br />4 <br />AC <br />$180.00 <br />$684.00 <br />9 <br />Straw mulch - furnish, place and <br />crimp certified weed free straw <br />mulch <br />7 <br />AC <br />$500.00 <br />$3,500.00 <br />10 <br />Erosion Control - provide <br />required erosion control around <br />disturbed areas to comply with <br />Stormwater Management Plan <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />11 <br />Monitor Wells - Furnish <br />equipment, labor and materials to <br />install three monitor wells to a <br />depth of 12 feet. Wells shall <br />consist of 2 inch diameter slotted <br />PVC pipe <br />3 <br />EA <br />$200.00 <br />$600.00 <br />12 <br />Construction Management - <br />provide qualified construction <br />manager to maintain compliance <br />with approved construction <br />drawings <br />1 <br />LS <br />$15,000.00 <br />$15,000.00 <br />13 <br />Construction Surveying - <br />provide accurate layout in <br />compliance with construction <br />drawings <br />1 <br />LS <br />$6,000.00 <br />$6,000.00 <br />14 <br />Mobilization - mobilization and <br />demobilization of equipment and <br />labor necessary to perform work <br />1 <br />LS <br />$6,500.00 <br />$6,500.00 <br />TOTAL $270,538.00 <br />D. Responsible Parties <br />1. Elam will be responsible for all technical revisions submitted to DRMS and any <br />adjustments to the bond amount that come about as a result of these changes. <br />WestWater Engineering Page 22 of 24 July 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.