Laserfiche WebLink
Table of Contents <br />INTRODUCTION 1 <br />I. PROJECT DESCRIPTION 1 <br />A. Location of Project 1 <br />B. Summary of Overall Project 1 <br />C. Responsible Parties 2 <br />D. Jurisdictional Areas to be Filled 3 <br />E. Types, Functions and Values of the Jurisdictional Areas 3 <br />II. GOALS OF MITIGATION 3 <br />A. Goals of the proposed mitigation are: 3 <br />B. Types of Habitat to be created 3 <br />III. FINAL SUCCESS CRITERIA 8 <br />A. Vegetation 8 <br />B. Hydrology 9 <br />C. Soils 9 <br />IV. PROPOSED MITIGATION SITE 9 <br />A. Location and Size 9 <br />V. IMPLEMENTATION PLAN 12 <br />A. Rationale for Expecting Implementation Success 12 <br />B. Responsible Parties 12 <br />C. Site Preparation 12 <br />D. Planting Plan 13 <br />E. Willow, Dogwood, and Assorted Riparian Shrubs 14 <br />F. Cottonwoods 14 <br />G. Seeding 15 <br />H. Application Rate, Method, and Mulch 15 <br />I. Seed Mixes by Planting Zone 15 <br />J. Schedule 16 <br />K. Irrigation Plan 16 <br />L. As -Built Conditions 17 <br />VI. MAINTENANCE DURING MONITORING PERIOD 17 <br />A. Maintenance Activities 17 <br />B. Responsible Parties 17 <br />C. Schedule 18 <br />VII. MONITORING PLAN 18 <br />A. Performance criteria 18 <br />B. Monitoring Methods 19 <br />C. Vegetation 19 <br />D. Hydrology 19 <br />E. Soils 19 <br />F. Annual Reports 19 <br />WestWater Engineering Page i July 2012 <br />