My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-27_REVISION - M2010071
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010071
>
2015-10-27_REVISION - M2010071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:17 PM
Creation date
10/28/2015 8:15:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010071
IBM Index Class Name
REVISION
Doc Date
10/27/2015
Doc Name
Preliminary Adequacy Review AM01
From
DRMS
To
Weiland, Inc.
Type & Sequence
AM1
Email Name
MAC
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wayland <br />Page 12 <br />October 27, 2015 <br />3. The Division received comments from History Colorado and the Colorado Division of Water <br />Resources. The letters are attached for your review. Please address the comments noted in <br />the letters and make any changes to the application as necessary. <br />6.4.1 Exhibit A — Legal Description <br />No comment. <br />6.4.2 Exhibit B — No Comment <br />No comment. <br />6.4.3 Exhibit C — Pre -mining and Mining Plan Map of Affected Lands <br />4. A review of the original structure list provided under Exhibit S, shows that there are <br />permanent man-made structures which have not been labeled on Exhibit C-1 Pre -Mine Map. <br />Please provide a revised copy of Exhibit C-1 Pre -Mine Map with all permanent man-made <br />structures labeled; see additional comments under Exhibit S, Item No. 29. <br />6.4.4 Exhibit D — Mining Plan <br />5. The materials processing area is currently located within the western half of Reservoir #4. <br />Please specify where the processing area will be located when the remainder of Reservoir #4 <br />is mined out. <br />6. The Applicant has indicated that overburden which was stripped from the processing area <br />was stockpiled immediately to the east. Please specify where topsoil from the processing area <br />was stockpiled and specify where the overburden stockpile will be moved to when the east <br />half of Reservoir is mined out. <br />7. Exhibit C-1 — Pre -Mine Plan Map shows that Reservoir #4 is located within a 100 year <br />floodplain. However, the floodplain is not identified. Please specify the water course which <br />corresponds to the floodplain and specify the distance between Reservoir #4 and the water <br />course. <br />8. The currently approved Mining Plan states that no overburden or topsoil would be stockpiled <br />within the floodplain. However, during the inspection conducted on July 30, 2015 the <br />Division observed stockpiles adjacent to the material processing area which were within the <br />floodplain. Please provide a technical justification for locating stockpiles within the <br />floodplain. <br />9. The currently approved Mining Plan calls for maintaining 3H:1V mine slope as the <br />excavation approached the limits of mining. The Operator was unable to obtain structure <br />
The URL can be used to link to this page
Your browser does not support the video tag.