Laserfiche WebLink
IT <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> CQA ACTIVITIES: <br /> 1) Field Activities: <br /> The following activities were observed: Placement and compaction of the Phase 1 Structural Fill <br /> materials; subgrade acceptance; placement, compaction, density testing, depth verification and <br /> acceptance of Soil Liner Fill materials; geomembrane installation and acceptance; Drain Cover Fill <br /> placement; Spent Ore grading in PSSA; and pump monitoring at the LVSCS riser pipes. <br /> 11) Laboratory Activities: <br /> Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br /> continued. <br /> The following samples were collected: Cameron—Soil Liner Fill; SLF-197-C <br /> Phase 1 —Soil Liner Fill; 1-SLF-45-R <br /> Phase 1 — Drain Cover Fill; 1-DCF-9-R <br /> Phase 1 — Drain Cover Fill; 1-DCF-10-R <br /> Phase 1 — Drain Cover Fill; 1-DCF-11-R <br /> General Project Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held September 29, 2015 (Amec Foster Wheeler, CC&V, Ames). <br /> Amec Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br /> Contractor Meeting. <br /> Ames daily safety meetings <br /> Amec Foster Wheeler daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br /> Wheeler, and Ames. <br /> Deliveries: ECA received 12 rolls of 80-mil LLDPE textured geomembrane. <br /> CQA Monitor <br /> Submitted by: �___ Date: October 7, 2015 <br /> Bobby Redd, El <br /> Project Resident <br /> Reviewed by: _ Date: <br /> CC&V Projects <br /> Reviewed By: ^� Date: /z)1,05 <br /> Reviewed By: Date: <br />