My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-23_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-10-23_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 1:18:52 AM
Creation date
10/27/2015 11:33:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/23/2015
Doc Name
Weekly QA Report
From
Newport
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.k. <br /> CRIPPLE CREEK & VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF)WEEKLY REPORT foster <br /> wheeler <br /> Owner: Cripple Creek &Victor Gold Mining Co. Project Number: 74201125NO <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: October 3, 2015 <br /> Location: Cripple Creek &Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 9.27.2015 through 10.03.2015 <br /> Days S I M I T I W T F S <br /> D D D D D D <br /> Work Shifts <br /> D=Day Shift N=Night Shift W=Weather <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 57°F to 72°F Cloud Cover: Partly Cloudy to Mostly Cloudy <br /> Lows: 40°F to 48°F Precipitation: Rain <br /> Wind: Calm to moderate <br /> Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> 1) Earthworks <br /> A) VLF (PSSA, Phase 1, and 2) <br /> Structural Fill: <br /> The following Structural Fill haul to fill and grading activities occurred: <br /> Cat dozers graded the slope between stations F10+00 to F12+00 and H8+00 to H10+00. A Cat <br /> excavator with a smooth drum roller attachment compacted the fill areas. <br /> Cat dozers graded the slope above station 60+00 of the ADR haul road. Cat 740 haul trucks <br /> hauled spoils from station 60+00 to J2+00. Cat dozers placed structural fill in the vicinity of J <br /> Bench. A Cat smooth drum roller compacted the fill areas. <br /> Cat 740 haul trucks hauled Structural Fill to the fill area above stations F24+00. A Cat D8 dozer <br /> placed Structural Fill upslope from stations F24+00 to F26+00. A Cat loader placed Structural Fill <br /> above station F18+00. A Cat smooth drum roller compacted the fill area. <br /> CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat dozer <br /> placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br /> compacted the fill area. <br /> All of the above Structural Fill material was placed, compacted, and graded per the project plans <br /> and specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.