Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> CQA ACTIVITIES: <br /> 1) Field Activities: <br /> The following activities were observed: Placement and compaction of the Phase 1 Structural Fill <br /> materials; subgrade acceptance; placement, compaction, density testing, depth verification and <br /> acceptance of Soil Liner Fill materials; geomembrane installation and acceptance; Drain Cover Fill <br /> placerent; Spent Ore grading in PSSA; and pump monitoring at the LVSCS riser pipes. <br /> II) Laboratory Activities: <br /> Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br /> continued. <br /> The following samples were collected: Phase 1 —Soil Liner Fill; 1-SLF-46-R <br /> General Proiect Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held October 6, 2015 (Amec Foster Wheeler, CC&V, Ames). Amec <br /> Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br /> Contractor Meeting. <br /> Ames daily safety meetings <br /> Amec Foster Wheeler daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br /> Wheeler, and Ames. <br /> Deliveries: None. <br /> CQA Monitor <br /> Submitted by: Date: October 14, 2015 <br /> Bobby Redd, El <br /> Project Resident <br /> Reviewed by: rC Date: <br /> CC&V Projects <br /> Reviewed By: Date: <br /> Reviewed By: Date: <br />