Laserfiche WebLink
SEDCAD 4 for Windows <br />r—.inhf 100A -901n D-1. I crh,uah <br />1 <br />SDH -3 POND EXPANSI <br />N 2015 <br />10yr-24hr w/ Sedimentology <br />Note; Subwatersheds #4 of all ponds are used to generate a <br />peak flow (by themselves) equal to the maximum output of the <br />pump installed in SDH -3 (350 gpm), <br />Scott Wanstedt <br />Blue Mountain Energy, Inc. <br />3607 CR 65 <br />Rangely, CO 81648 <br />Phone: 970-675-4322 <br />Email: swanstedt@deserado.com <br />Filename: SDH -3 Pond Expansion 2015.sc4 Printed 09-10-2015 <br />