Laserfiche WebLink
SEDCAD 4 for Windows <br />1 <br />DH -3 POND EXPANSION 201 <br />100yr--Z4hr <br />Note; Subwatersheds #4 for all ponds are used to generate peak <br />flows (by themselves) equal to the maximum output of the pump <br />installed in SDH -3 (350 gpm), <br />Scott Wanstedt <br />Blue Mountain Energy, Inc. <br />3607 CR 65 <br />Rangely, CO 81648 <br />Phone: 970-675-4322 <br />Email: swanstedt@deserado.com <br />Filename: SDH -3 Pond Expansion 2015 100 -yr hydrology.sc4 Printed 09-10-2015 <br />