Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />Tri-State Generation and Transmission Assoication, Inc. (Tri-State), owns and operates a 345 kV power <br />line which is located within the permit boundary and is shown on Map 22. Tri-State is required to <br />maintain proper phase to ground clearences under all their power lines, and will be conducting ground <br />disturbances activites within their 150' right-of-way, within the permit boundary, in two approximate <br />locations as shown on Figure 4.12-3. The final loctions will be determined by Tri-State. These ground <br />disturbing activites are not associated with the Colowyo Mine and will not be required to be permitted <br />and bonded for in accordance with Rule 3.02.1(2). <br />Rule 4 Performance Standards 4.12-2 Revision Date: 10/06/15 <br />Revision No.: MR -147 <br />