My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-26_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2015-10-26_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 3:03:27 PM
Creation date
10/27/2015 7:39:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/26/2015
Doc Name Note
2015
Doc Name
2015 Midterm Review & Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
MT7
Email Name
BFB
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Horizon Mine <br />PROJECT IDENTIFICATION <br />Task #: 057 <br />Date: 10/22/2015 <br />User: JDM <br />BULLDOZER WORK <br />diversion/collection ditches <br />Permit Action: 2015 Midterm Review <br />State: Colorado <br />County: Montrose <br />Page 91 of 162 <br />Permit/Job#: C1981008 <br />Abbreviation: None <br />Filename: C008-057 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D3K XL - <br />3P <br />Horsepower: 74 <br />Blade Type: Power Angle Tilt <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$10.98 <br />NA <br />Operating Cost/Hour: <br />$28.61 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: 0 <br />Total Fleet Cost/Hour: $77.60 <br />MATERIAL QUANTITIES <br />Initial Volume: 12,953 <br />Swell factor: 1.165 <br />Loose volume: 15,090 LCY <br />Source of estimated volume: Length from map 2.05.3-1, X -sec from Sec 2.05.3 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />169.6 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push <br />gradient: <br />Average site altitude <br />Material weight: <br />0% <br />5,700 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.