My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-26_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2015-10-26_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 3:03:27 PM
Creation date
10/27/2015 7:39:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/26/2015
Doc Name Note
2015
Doc Name
2015 Midterm Review & Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
MT7
Email Name
BFB
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Replace topsoil on Pond 010 <br />Site: New Horizon Mine Permit Action: 2015 Midterm Review <br />PROJECT IDENTIFICATION <br />Page 75 of 162 <br />Permit/Job#: C1981008 <br />Task #: 52B State: Colorado Abbreviation: None <br />Date: 10/23/2015 County: Montrose Filename: C008 -52B <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT <br />-Scraper: Cat 631G <br />-Dozer: Cat D9T - 9SU <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraner Work Team Sunnort Faninment Maintenance Fouinment <br />Total work team cost/hour: $824.17 <br />MATERIAL OUANTITIES <br />Initial volume: 4,200 <br />Scraper <br />Dozer Load Area <br />Dump Area Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 NA <br />NA NA <br />NA <br />Ownership cost/hour: <br />$80.91 <br />$72.57 NA <br />NA NA <br />NA <br />Operating cost/hour: <br />$170.75 <br />$143.16 NA <br />NA NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 NA <br />NA NA <br />NA <br />Operator cost/hour: <br />$33.56 <br />$38.01 NA <br />NA NA <br />NA <br />Unit Subtotals: <br />$285.22 <br />$253.73 NA <br />NA NA <br />NA <br />Number of Units: <br />2 <br />1 0 <br />0 0 <br />0 <br />Group Subtotals: <br />Work: <br />$824.17 Support: <br />$0.00 Maint: <br />$0.00 <br />Total work team cost/hour: $824.17 <br />MATERIAL OUANTITIES <br />Initial volume: 4,200 <br />CCY Swell factor: 1.100 <br />Loose volume: 4,620 <br />LCY <br />Source of estimated volume: <br />1.42 acres, 22" depth <br />Source of estimated swell factor: <br />Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,100 lbs/LCY <br />Struck Volume: 24.00 <br />LCY <br />Material description: User Provided <br />Heaped Volume: 34.00 <br />LCY <br />Rated Payload: 81,600 pounds <br />Average Volume: 29.00 <br />LCY <br />Payload Capacity: 38.86 LCY <br />Adjusted Capacity: 29.00 <br />LCY <br />CRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.