My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-26_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2015-10-26_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 3:03:27 PM
Creation date
10/27/2015 7:39:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/26/2015
Doc Name Note
2015
Doc Name
2015 Midterm Review & Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
MT7
Email Name
BFB
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 43 of 162 <br />SCRAPER TEAM WORK <br />Task description: Replace topsoil on 31.68 ac Morgan property Zone 3 <br />Site: New Horizon Mine Permit Action: 2015 Midterm Review Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 30B State: Colorado Abbreviation: None <br />Date: 10/23/2015 County: Montrose Filename: C008 -30B <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT <br />-Scraper: Cat 631G <br />-Dozer: Cat D9T - 9SU <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Scraner Work Team <br />Sunnort Eaninment Maintenance Eaninment <br />Total work team cost/hour: $1,794.19 <br />MATERIAL OUANTITIES <br />Initial volume: 370,550 <br />Scraper <br />Dozer Load Area <br />Dump Area Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 NA <br />NA 50 <br />50 <br />Ownership cost/hour: <br />$80.91 <br />$72.57 NA <br />NA $42.03 <br />$20.53 <br />Operating cost/hour: <br />$170.75 <br />$143.16 NA <br />NA $34.94 <br />$23.89 <br />Ripper op. cost/hour: <br />NA <br />$0.00 NA <br />NA $0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />$38.01 NA <br />NA $24.47 <br />$0.00 <br />Unit Subtotals: <br />$285.22 <br />$253.73 NA <br />NA $101.43 <br />$44.42 <br />Number of Units: <br />4 <br />2 0 <br />0 1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,64834 Support: <br />$0.00 Maint: <br />$145.85 <br />Total work team cost/hour: $1,794.19 <br />MATERIAL OUANTITIES <br />Initial volume: 370,550 <br />CCY Swell factor: 1.100 <br />Loose volume: 407,605 <br />LCY <br />Source of estimated volume: <br />Map 2.05.4-6, 54"A/B, 33" sub <br />Source of estimated swell factor: <br />Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,100 lbs/LCY <br />Struck Volume: 24.00 <br />LCY <br />Material description: User Provided <br />Heaped Volume: 34.00 <br />LCY <br />Rated Payload: 81,600 pounds <br />Average Volume: 29.00 <br />LCY <br />Payload Capacity: 38.86 LCY <br />Adjusted Capacity: 29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.