My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-26_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2015-10-26_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 3:03:27 PM
Creation date
10/27/2015 7:39:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/26/2015
Doc Name Note
2015
Doc Name
2015 Midterm Review & Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
MT7
Email Name
BFB
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Replace topsoil on 20.02 ac Morgan property, Zones 1-2 <br />Site: New Horizon Mine Permit Action: 2015 Midterm Review Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 30A State: Colorado <br />Date: 10/23/2015 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 631G <br />-Dozer: Cat D9T - 9U <br />Abbreviation: None <br />Filename: C008 -30A <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Scraper Work Team <br />Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $1,794.19 <br />MATERIAL OUANTITIES <br />Initial volume: 145,561 CCY Swell factor: 1.100 <br />Loose volume: 160,117 LCY <br />Source of estimated volume: Map 2.05.4-6, 21" AB, 33" subsoil <br />Source of estimated swell factor: Division estimate <br />HOURLY PRODUCTION <br />Material weight: 2,100lbs/LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$80.91 <br />$72.57 <br />NA <br />NA <br />$42.03 <br />$20.53 <br />Operating cost/hour: <br />$170.75 <br />$143.16 <br />NA <br />NA <br />$34.94 <br />$23.89 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />$38.01 <br />NA <br />NA <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$285.22 <br />$253.73 <br />NA <br />NA <br />$101.43 <br />$44.42 <br />Number of Units: <br />4 <br />2 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,64834 <br />Support: <br />$0.00 <br />Maint: <br />$145.85 <br />Total work team cost/hour: $1,794.19 <br />MATERIAL OUANTITIES <br />Initial volume: 145,561 CCY Swell factor: 1.100 <br />Loose volume: 160,117 LCY <br />Source of estimated volume: Map 2.05.4-6, 21" AB, 33" subsoil <br />Source of estimated swell factor: Division estimate <br />HOURLY PRODUCTION <br />Material weight: 2,100lbs/LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.