My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-26_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2015-10-26_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 3:03:27 PM
Creation date
10/27/2015 7:39:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/26/2015
Doc Name Note
2015
Doc Name
2015 Midterm Review & Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
MT7
Email Name
BFB
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: 2015 Midterm Review Summary of Tasks <br />Site: New Horizon Mine Permit Action: 2015 Midterm Review Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 10/26/2015 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C008-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />002B <br />003 <br />004 <br />005C <br />007 <br />008 <br />009 <br />010 <br />012 <br />013 <br />014 <br />015 <br />016 <br />021 <br />021A <br />021B <br />022 <br />024 <br />027 <br />028 <br />030A <br />030B <br />030C <br />030D <br />030E <br />030F <br />Drill and shoot pit highwall <br />BLASTING <br />1 <br />2 <br />2 <br />2 <br />1 <br />1 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />83.03 <br />$26,540.00 <br />$77,242.00 <br />$30,625.00 <br />$214,717.00 <br />$1,571.00 <br />$215,289.00 <br />$28,366.00 <br />$1,303.00 <br />$15,020.00 <br />$2,061.00 <br />$1,227.40 <br />$1,740.31 <br />$35,839.65 <br />$3,402.58 <br />$666.03 <br />$7,771.96 <br />$48,516.71 <br />$6,047.29 <br />$4,197.55 <br />$9,893.40 <br />$65,705.00 <br />$16,900.00 <br />$101,947.00 <br />$274,714.00 <br />$540,474.00 <br />$567,872.00 <br />$371,002.00 <br />$15,068.00 <br />Push Highwall Block 1 into Pit <br />DOZER <br />152.21 <br />Push Highwall Block 2 into pit <br />DOZER <br />60.35 <br />Grade Spoil Side Material and Coal Stockpile into <br />Pit <br />DOZER <br />423.11 <br />Drill and Shoot Highwall Side of Pit Ramp <br />BLASTING <br />5.59 <br />Haul boxcut spoil (Nt. Nucla) to pit <br />TRUCKI <br />139.68 <br />Grades oil side of pit ramp <br />DOZER <br />55.90 <br />Grade highwall side of ramp <br />DOZER <br />2.57 <br />Final grade disturbed areas (not bond released) <br />GRADER <br />110.14 <br />Rip spoil/topsoil interface <br />GRADER <br />14.37 <br />Seal 2" Wells <br />BOREHOLE <br />2.00 <br />Seal 4" holes <br />BOREHOLE <br />3.00 <br />Seal 4" wells requiring displacement <br />BOREHOLE <br />3.00 <br />Seal 2004 Exploration Wells - 7 <br />BOREHOLE <br />5.00 <br />Seal 4" Wells <br />BOREHOLE <br />2.00 <br />Remove culverts and pond dewatering pipes <br />DEMOLISH <br />0.00 <br />Install French Drain at Highwall <br />DEMOLISH <br />64.00 <br />Install Additional Above Ground Pipe Segment C <br />DEMOLISH <br />10.00 <br />Demolish and Remove Hay Shed <br />DEMOLISH <br />8.00 <br />Remove Debris from Boneyards <br />SITEMAINT <br />ENANCE <br />20.00 <br />Replace Powerlines on BB and 2700 Roads <br />SITEMAINT <br />ENANCE <br />0.00 <br />Replace Telephone Lines on BB and 2700 Roads <br />SITEMAINT <br />ENANCE <br />0.00 <br />Replace topsoil on 20.02 ac Morgan property, <br />Zones 1-2 <br />SCRAPERI <br />56.82 <br />Replace topsoil on 31.68 ac Morgan property Zone <br />3 <br />SCRAPERI <br />153.11 <br />Replace topsoil on 54.33 ac Morgan property Zone <br />4 <br />SCRAPERI <br />301.24 <br />Replace topsoil on 106.8 ac Lloyd/Benson property <br />Zone 6 <br />SCRAPERI <br />312.35 <br />Replace topsoil on 100.6 ac WFC/Lloyd property <br />Zone 7 <br />SCRAPERI <br />206.78 <br />Replace topsoil on 2.83 ac WFC property (Pond <br />013 - Zone 8) <br />SCRAPERI <br />8.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.