My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-26_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2015-10-26_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 3:03:27 PM
Creation date
10/27/2015 7:39:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/26/2015
Doc Name Note
2015
Doc Name
2015 Midterm Review & Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
MT7
Email Name
BFB
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 18 of 162 <br />Truck Cycle Time: <br />Truck Exchange Time: 0.70 Minutes Adjusted for site altitude: 0.700 Minutes <br />Truck Load Time: 1.585 Minutes Adjusted for site altitude: 1.585 Minutes <br />Truck Maneuver and Dump 1.10 Minutes Adjusted for site altitude: 1.100 Minutes <br />Time: <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance <br />Grade (%) Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />(Ft) <br />Production <br />(%) <br />mm <br />1 4000.00 <br />-1.30 3.00 <br />1.70 <br />3448 <br />1.655 <br />2 10000.00 <br />-1.30 3.00 <br />1.70 <br />3448 <br />2.900 <br />Haul Time: 4.555 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />199.79 <br />LCY/Hour Adjusted for job efficiency: <br />165.82 LCY/Hour <br />Optimal No. of Trucks: <br />mm <br />Truck(s) Selected Number of Trucks: <br />4 Truck(s) <br />1 <br />10000.00 <br />1.30 <br />3.00 <br />4.30 <br />3540 <br />3.087 <br />LCY/Hour <br />2 <br />4000.00 <br />1.30 <br />3.00 <br />4.30 <br />3540 <br />1.130 <br />1 <br />CIRCES Cost Estimating Software <br />Return Time: 4.217 <br />minutes <br />Total Truck Cycle Time: 12.157 <br />minutes <br />Loading Tool unit <br />Production <br />1,062.93 <br />LCY/Hour Adjusted for job efficiency: <br />882.23 LCY/Hour <br />Truck Unit Production <br />199.79 <br />LCY/Hour Adjusted for job efficiency: <br />165.82 LCY/Hour <br />Optimal No. of Trucks: <br />5 <br />Truck(s) Selected Number of Trucks: <br />4 Truck(s) <br />Adjusted hourly truck team production: 663.29 <br />LCY/Hour <br />Adjusted single truck/loader team production: 663.29 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 663.29 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 139.68 <br />Hours <br />Unit cost: <br />$2324 <br />/LCY Total job cost: $215,289 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.