My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-26_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2015-10-26_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 3:03:27 PM
Creation date
10/27/2015 7:39:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/26/2015
Doc Name Note
2015
Doc Name
2015 Midterm Review & Cost Estimate
From
Jason Musick
To
Brock Bowles
Type & Sequence
MT7
Email Name
BFB
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: Haul boxcut spoil (Nt. Nucla) to pit <br />Site: New Horizon Mine Permit Action: 2015 Midterm Review Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 05C State: Colorado Abbreviation: None <br />Date: 10/23/2015 County: Montrose Filename: C008 -05C <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />Truck Loader Team -Truck: <br />-Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Truck/Loader Team <br />Cat 773F <br />CAT 988H <br />Cat D9T - 9SU <br />Cat D9T - 9SU <br />CAT 14M <br />Water Tanker, 5,000 Gal. <br />Sunnort Eauinment <br />Maintenance Eauinment <br />Total work team cost/hour: $1,541.25 <br />MATERIAL OUANTITIES <br />Initial volume: 79,529 CCY Swell factor: 1.165 <br />Loose volume: 92,651 LCY <br />Source of estimated volume: Operator estimate of stockpile volume <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />75 <br />50 <br />20 <br />50 <br />50 <br />Ownership cost/hour: <br />$65.23 <br />$78.65 <br />$72.57 <br />$72.57 <br />$42.03 <br />$20.53 <br />Operating cost/hour: <br />$124.51 <br />$88.11 <br />$71.58 <br />$28.63 <br />$34.94 <br />$23.89 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$27.80 <br />$37.13 <br />$38.01 <br />$38.01 <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$217.54 <br />$203.88 <br />$182.15 <br />$139.21 <br />$101.43 <br />$44.42 <br />Number of Units: <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,074.04 <br />Support: <br />$321.36 <br />Maint: <br />$145.85 <br />Total work team cost/hour: $1,541.25 <br />MATERIAL OUANTITIES <br />Initial volume: 79,529 CCY Swell factor: 1.165 <br />Loose volume: 92,651 LCY <br />Source of estimated volume: Operator estimate of stockpile volume <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.