Laserfiche WebLink
Page 4 of 6 <br /> <br /> <br />9. Estimated acres to be reclaimed in the next report year: <br /> <br />10. Total acres in various stages of reclamation, since permitted exploration activities began: <br /> <br /> <br />Total acres <br />backfilled: <br /> <br /> Total acres <br />seeded w/ <br />approved mix: <br /> Total acres <br />w/topsoil <br />replaced: <br /> Total acres <br />mulched w/ <br />approved mulch: <br /> <br />Total acres <br />graded: <br /> <br /> Total acres <br />fertilized w/ <br />apvd fertilizer: <br /> Topsoil <br />replacement <br />depth (in.): <br /> Mulch application <br />rate (tons/ac): <br /> <br /> <br />Seed <br />application <br />method: <br /> Fertilizer <br />application <br />method: <br /> Mulch <br />application <br />method: <br /> <br /> <br />11. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO N/A <br />If “YES”, indicate the weed species, control area, control type, application rate and treatment date on the report map. <br /> <br />12. Is adequate topsoil reserved for reclamation, based on your approved NOI? YES NO N/A <br />If “NO”, please explain: <br /> <br /> <br /> <br /> <br /> <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br />If “NO” please explain: <br /> <br /> <br /> <br /> <br /> <br />14. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of the <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/A <br /> <br />15. Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br /> <br />16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring information <br />annually? YES NO N/A <br /> <br />If “Yes”, please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br /> <br />17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in place <br />and is adequate to fully reclaim the approved prospecting site disturbance(s). <br /> <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: <br /> <br />18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />