Laserfiche WebLink
• <br /> <br />COLOWYO COAL COMPANY <br />047A-PROSPECT <br />SEDIMENTATION POND SUMMARY <br /> ORIaiNAI 1996 1998 2006 DIFFERENCE <br /> CONFIGURATION STUDY STUDY DIFFERENCE STUDY 1988 TO 2008 <br />ATER8HfD AREA {acres}: <br />Disturbed O.D 4.0 O.D 0.4 <br />PoshniNng Tapsoited and Seeded 45.0 88.0 23.0 103,8 35.8 <br />Pastmining Undtsturbad 211.3 191.5 -19.8 236.8 45.3 <br />1.2 Year RaGamatkur 59.d 178.3 118.5 231.4 53.1 <br />3+YearRectamaUan 465.6 312.8 -152.7 12$.9 -184.0 <br />Total Area 781.3 750,7 -30.6 701.0 -49.7 <br />POND PARAMETERS: <br />Bottom Elevation 6735.7 6735,7 6735.7 0,0 6734.0 -1.7 <br />Principal Splttway Invert Elevation 6750,3 6748.8 8750.3 i.5 6750.3 0.0 <br />EmergancySptitvraytnvertElevaBon 6751;6 8751.6 6751.6 0.0 6752.0 0,4 <br />Tap of Emt~nkment 6754.0 6754.0 $754.4 4.0 8755.0 1.D <br />Storage votame Belaw Emergency SpilAvay (ac-ft} 5.26 5.26 5,30 0,04 8.1 0.8 <br />Staraga Valumo Below Principal Sp[ikvay {ac•ft} 4.81 3.65 4.52 0.87 5.1 0.$ <br />Principal SpilAuay Parameters: <br />Type Drop Inlet Drop Iniai Pert, Riser Perf. Riser <br />Riser Diameter (tn) 12.4 12.0 12.0 qA 12.0 0.0 <br />Riser Hetgfit {ft} 8.7 7,2 8,7 1.5 8J 0,0 <br />Barra) Diameter {trr) 12.0 12.0 12.0 0.0 12.0 0.0 <br />Elevation of Pefaration{$) {ft) NIA NIA 6744.4 6744.0 <br />Size of Perforation{s) (in} NIA NIA 4.D 4.0 <br />Number of Portaraaons NIA NIA 2 2.0 <br />Emergency Spillway Parameters: <br />Type <br />Trapezoidal <br />Trapezoidal <br />Trapezoidal <br />Trapezoidal <br />Dtamete€ ('us) N/A N!A NIA NIA <br />BottomWldth{tt} 12.0 12.4 12.0 0.0 12.0 0.0 <br />t.angih {ft) 20..4 20.0 24.0 0,0 20.4 OA <br />Side Slapes'z'Hr1V {ft} 2,0 2,0 1.5 -4.5 1.5 0.4 <br />HYDROLOGICJHYDRAULtG PARAMETERS: <br />Base F)aw Rates (cis} 2A4 0.43 -1.97 4.15 0.1 <br />t0-Year, 2d-HOUrStorm Event: <br />i <br />8 <br />1 <br />8 <br />0 <br />0 <br />1.8 <br />0.0 <br />Precipttattan {tn) . <br />7 <br />2 . <br />4 <br />3 . <br />1 <br />6 3.2 =1.1 <br />Runoff volume (ac-itT <br />Pdnclpai Sp±thway Peak Discharge {cis} , <br />6.0 . <br />2.0 . <br />-4.4 1.5 -4. <br />Emergency Spiiiwey Peak Discharge (~} 4.0 4.0 0.0 4.0 0.4 <br />Peak Surface Water Stage Elevattdrt {ft) 6751.3 6749.5 -1.8 8747.0 -2.5 <br />25-Year, 24-Haur Storm Event: <br />2 <br />3 <br />2 <br />3 <br />0.4 <br />2,3 <br />0.0 <br />Prectpttatton {in} . <br />4 <br />5 . <br />8 <br />3 2.9 8.3 0.0 <br />RunoftVOlumo(ac-!t} <br />Principal Spillway Paak Discharge (cis} , <br />6.9 . <br />d,5 -2.4 4.0 -0.5 <br />Emergency Spillway Peak Discharge {cfs} 9.8 3A -8.8 0.0 -3.0 <br />Peak Surface Water5tage Eiavatian (ft) 6752.1 6751.8 -0.3 6751.4 -0.4 <br />Pond Fraebaard fl} 1.9 22 0,3 3.6 1.4 <br />EOIMENT LOADING PARAMETERS: <br />Storm Predicted Peak Settiaf~e Conceniratlan {mltl) 4.00 4.00 0.0 0,00 a,0 <br />Predicted Annual Sediment loading {ac-ft) 0.09 0.52 0.43 1.91 1.4 <br />Available Sediment Storage Volume (aa-it} 0.76 D.76 0.00 1,41 0.7 <br />Maximum Sediment Storage Elevation {ft} 6741.8 8741.6 6741.6 0.0 5741.6 0.0 <br />Predicted Number cf Stara a Years 8.4 1.5 -7.0 0.7 -0.7 <br />Exh. 7-PP-21 Revision Date: 2/1/06 <br />Revision No.: TR-63 <br />