Laserfiche WebLink
• Discharge flow basis for emergency spillway capacity evaluation (for a Class B pond): <br />• 100 -yr, 6 -hr peak flow + 0.12 (PMP, 6 -hr peak flow - 100 -yr, 6 -hr peak flow) <br />• Discharge flow basis for impoundment freeboard evaluation (for a Class B pond): <br />• 100 -yr, 6 -hr peak flow + 0.4 (PMP, 6 -hr peak flow - 100 -yr, 6 -hr peak flow) <br />TABLE 5 <br />IMPOUNDMENT HAZARD ANALYSIS SUMMARY <br />IMPOUNDMENT <br />HAZARD <br />SPILLWAY <br />FREEBOARD <br />CLASSIFICATION/BASIS <br />CAPACITY <br />EVALUATION <br />EVALUATION <br />BASIS /RESULT/ <br />BASISVRESULT <br />FREEBOARD <br />Streeter Pond (001A) <br />B /Proximity to State Highway <br />Class B /Ok <br />Class B /Ok/0.25' <br />13 <br />Work Area Pond (002A) <br />A /Agricultural Land <br />Class B /Ok <br />Class B /Ok/1.55' <br />Gossard Pond (003A) <br />A/Agricultural Land <br />Class B /Ok <br />Class B/Ok/6.46' <br />Gulch A Pond (004A) <br />A /Agricultural Land <br />Class B /Ok <br />Class B /Ok/0.16' <br />Stoker Siding Pond <br />A/Agricultural Land <br />Class B /Ok <br />Class B/Ok/3.64' <br />(005A) <br />Rail Loop Pond (006A) <br />A/Agricultural Land <br />Class B /Ok <br />Class B /Ok/1.82' <br />Prospect Pond (007A) <br />B /Proximity to State Highway <br />Class B /Ok <br />Class B /Ok/0.61' <br />13 <br />West Pit Pond (008A) <br />A/Agricultural Land <br />Class B /Ok <br />Class B/Ok/2.47' <br />Section 16 Pond (009A) <br />B /Proximity to State Highway <br />Class B /Ok <br />Class B/Ok/0.96' <br />13 <br />East Taylor Pond (01OA) <br />A/Agricultural Land <br />Class B /Ok <br />Class B/Ok/0.76' <br />Taylor Pump Holding <br />A /Agricultural Land <br />Class B /Ok <br />Class B /Ok/0.91' <br />Pond <br />Notes: 1 Spillway capacity and freeboard for all ponds were evaluated for a uniform worst -case <br />hazard classification (Class B) <br />The results of the W WC impoundment hazard analysis indicate that emergency spillway capacities and <br />available freeboard for all existing ponds are adequate to affect full compliance with applicable <br />requirements under the guidelines of TR -60, based on the applicable hazard classifications. Given this <br />confirmation of compliance, no modifications to the existing emergency spillway structures are required. <br />5.0 POND DESIGN EVALUATION RESULTS <br />The results of the pond design analyses are summarized in Table 6. The supporting SEDCAD4 analyses <br />and watershed maps are presented as attachments in each of the individual pond design sections <br />Exhibit 7 Page 8 Revision Date: 3/18/13 <br />Revision No.: TR -95 <br />