My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-22_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2015-10-22_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:51 PM
Creation date
10/22/2015 2:39:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
10/22/2015
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
10/20/2015
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 20, 2015 C-1996-083/Bowie No. 2 Mine JDM <br />- Ditch D -B 10 has continued to down cut along the west side of the mine facilities road near the turn and down <br />the road way from the curve and will need to be addressed. <br />Both maintenance items noted above have been addressed. D -B8 was clear and functioning as designed and D - <br />B10 has been repaired and rip -rap armor was installed to stabilize the ditch. <br />Bitch D -B 10 Repair <br />-The BMP hay bales directly behind the pumphouse will require replacement. In addition, the hay bales on the <br />west side of the area along the gravel will require replacement in the near future. <br />New hay bales were installed in the area noted above. No problems were noted. <br />PROCESSING WASTE/COAL MINE WASTE PILES — Rule 4.10 and 4.11 Drainage Control; Surface <br />Stabilization; Placement: <br />/-_1_ T'1_ 111 <br />Gob Pile 91 has been inactive. Technical Revision No. 97 was approved and provides a variance from the <br />requirement of Rule 4.10.4(4) for 0.2 acres of Gob Pile #1 where the slope was identified as being greater than 2:1 <br />Gob Pile #2 <br />Gob Pile #2 was wet due to the recent precipitation events. No activities were on-going during the inspection due <br />to the weather. The area on the east side of the pile was very stable with no issues. The west side of the pile in the <br />area of bench 95 was graded and stable with no issues noted. <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.