My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-19_REPORT - C1996083 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2015-10-19_REPORT - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:47 PM
Creation date
10/22/2015 10:11:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
10/19/2015
Doc Name
3rd 2015 Quarter refuse pile inspection report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />October 8, 2015 <br />970-249-6828 ■ 800-865-9847 (fax) ■ 222 South Park ■ Montrose, CO 81401 ■ wew.dowl.com <br />Alaska ■ Arizona ■ Colorado ■ Montana ■ North Dakota ■ Oregon ■ Washington ■ Wyoming <br />Huddleston -Berry Engineering and Testing, LLC <br />640 White Avenue <br />Grand Junction, CO 81501 <br />Attention: Mike Berry, PE <br />SUBJECT: Third Quarter 2015 Summary of Inclinometer and Active Vibrating Wire <br />Piezometer Data through October 3, 2015, Bowie Mine No. 2, Coal <br />Waste Disposal Area No. 2 <br />Dear Mr. Berry, <br />DOWL has conducted quarterly monitoring of inclinometers and vibrating wire piezometers at <br />Coal Waste Disposal Area No. 2 (CWDA No. 2) for Bowie Resources, LLC (Bowie). This report is <br />intended to cover the time period of July through September 2015. VWP data was obtained on <br />9-26-15 and inclinometer data was obtained on 9-26-15 and 10-3-15. Per DRMS and your <br />instructions, vibrating wire piezometer readings for all active piezometers are taken quarterly <br />along with inclinometers. VWPs 06 and 08 were read monthly for July and August per DRMS <br />request as noted in Table 1. <br />Vibratina Wire Line Piezometers <br />Table 1. Summary of VWP Pore Pressures <br />VWP ID <br /># <br />Initial Pore <br />Pressure <br />(psi) <br />6/26/15 <br />Pore <br />Pressure <br />(psi) <br />8/01/15 <br />Pore <br />Pressure <br />(psi) <br />9/26/15 Pore <br />Pressure <br />(psi) <br />Difference <br />Since <br />Installation <br />(psi)si <br />Difference <br />Since Last <br />Reading <br />VWP-05 <br />6.8 <br />1.8 <br />2.2 <br />-4.6 <br />+0A <br />VWP-06 <br />11.3 <br />15.7 <br />15.4 <br />+4.1 <br />-0.3 <br />VWP-08 <br />8.2 <br />9.8 <br />9.9 <br />+1.7 <br />+0.1 <br />VWP-09 <br />2.8 <br />2.9 <br />2.9 <br />+0.1 <br />0 <br />VWP-10 <br />-1.9 <br />-1.8 <br />-1.8 <br />+0.1 <br />0 <br />The physical locations of the piezometers are shown on the attached Instrumentation Site Plan, <br />Drawing 1. The graph of historical data through 5-21-14 is presented for reference as Figure 1. <br />A graph of active piezometers only is presented as Figure 2. <br />Inclinometers <br />Three inclinometers, designated BG05-04, BG05-05, and BG05-07, were installed at CWDA No. <br />2 in August 2005. The inclinometers were installed through the coal refuse and approximately <br />20 feet into the native foundation soils. The physical locations of the inclinometers are shown <br />on the attached Instrumentation Site Plan, Drawing 1. Baseline readings were taken on <br />8/10/05 and subsequent readings have generally been taken quarterly since that time. <br />Displacement curves for the prior nine month period are presented as attachments to this letter <br />Bowie CDWA 2 VWP and Inclinometer Q3 2015 report <br />Project #7131.74111.01 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.