My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-19_REPORT - C1996083 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2015-10-19_REPORT - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:47 PM
Creation date
10/22/2015 10:11:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
10/19/2015
Doc Name
3rd 2015 Quarter refuse pile inspection report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CWDA No. 2 <br />#01349-0001 <br />10/14/15 <br />i i,Iluddlrstnr�-Bcrn <br />Discussion of Inclinometer Monitoring <br />The latest inclinometer readings indicate no significant movements since the last quarterly <br />reading. <br />Vibrating Wire Piezometers <br />Between 2005 and 2012, a total of ten vibrating wire piezometers were installed in CWDA No. <br />2. However, several of the piezometers have been damaged or have otherwise ceased to <br />function. Currently, five of the piezometers are functional. <br />Monitoring of the functioning piezometers was completed by DOWL on September 26th, 2015. <br />The attached monitoring report prepared by DOWL includes the piezometer monitoring data and <br />the data is summarized in the following table. <br />VWP <br />ID <br />Initial Pore <br />Pressure <br />(psi) <br />06/26/15 Pore <br />Pressure <br />(psi) <br />08/01/15 Pore <br />Pressure <br />(psi) <br />09/26/15 Pore <br />Pressure <br />(psi)(psi) <br />Difference Since <br />Installation <br />Difference <br />Since Last <br />Reading (psi) <br />VWP-05 <br />6.8 <br />1.8 <br />2.2 <br />-4.6 <br />+0.4 <br />VWP-06 <br />11.3 <br />15.9 <br />15.7 <br />15.4 <br />+41 <br />-0.3 <br />VWP-08 <br />8.2 <br />9.7 <br />9.8 <br />9.9 <br />+1_7 <br />+01 <br />VWP-09 <br />2.8 <br />2.9 <br />2.9 <br />+0.1 <br />0 <br />VWP-10 <br />-1.9 <br />-1.8 <br />-1.8 <br />+0.1 <br />0 <br />Discussion of Vibrating Wire Piezometers <br />VWP-n 5 <br />VWP-05 was installed on August 3, 2005 near the toe of CWDA No. 2 adjacent to the access <br />road/bench. The pore pressures recorded at VWP-05 have shown some seasonal fluctuations; <br />however, the range of pore pressure changes is fairly smallln general, HBET does not believe <br />that the pore pressures in VWP-05 are cause for concern regarding stability of the gob pile. <br />VWP-06 <br />VWP-06 was installed on June 5, 2009 near the existing top of CWDA No. 2. The pore <br />pressures recorded at VWP-06 have fluctuated since installation. The pore pressures increased <br />following installation until March 2013 and then fell until April 2014. However, between April <br />2014 and August 2014, the pore pressures again increased. This likely reflects the fact that gob <br />placement was occurring in the vicinity of this instrument during the spring and summer 2014. <br />There was a slight decrease between August 2014 and January 2015 which likely reflects the fact <br />that gob placement operations slowed and finally ceased for the winter. A slight increase was <br />reported between January 2015 and March 2015. However, the pore pressures have been <br />decreasing since March 2015. In general, HBET does not believe that the measured pore <br />pressures are an indication of any instability in CWDA No. 2. <br />VWP-08 <br />VWP-08 was installed on June 5, 2009 at a slightly lower elevation than VWP-06. The pore <br />pressures recorded at VWP-08 have fluctuated since installation. However, the fluctuations have <br />generally been within a narrow range of values. Slight pore pressure increases were recorded in <br />VWP-08 from April 2014 through January 2015. However, a slight decrease occurred between <br />January and March 2015. Since March 2015, pore pressures have increased slightly. As <br />indicated in the referenced Stability Evaluation report, the stability of CWDA No. 2 is sensitive <br />to increases in pore pressures in VWP-08. An increase in the pore pressure of 7 psi in VWP-08 <br />would result in a reduction of the Factor of Safety to below 1.5. <br />X:\2008 ALL PROJECTS\01349 -Bowie Resources, LLC\01349-0001 Bowie Mine\200 - Geo\Gob 2\Imtr ntation Monitoring\2015\01349-0001 GP2 3rdQ 2015 101415.doe 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.