EXHIBIT 7, ITEM 20, PART C <br />WEST TAYLOR SEDIMENTATION POND <br />The location of the West Taylor Sedimentation Pond is presented on Map 41A. The profiles of the <br />associated permanent ditches (West Taylor East and West Tributary Ditches) are presented on Map 3313. <br />Channel design of these permanent drainage channels is provided in Exhibit 7, Item 20, Part E. A design <br />drawing for the impoundment is presented on Figure 1C-3. For the active mining case, Figure 1C-4 <br />shows the breakdown of drainage areas and hydrologic conditions for this sediment pond, and Figure 1C- <br />5 provides a diagram of the structures and networking. For the post mining case, Figure 1C-6 shows the <br />breakdown of drainage areas and hydrologic conditions for this sediment pond, and Figure 1 C-7 provides <br />a diagram of the structures and networking. Table 4 of the introductory text of Exhibit 7, Item 20 <br />provides a summary of the design parameters for this sediment pond. <br />The following pages present the results of two SEDCAD runs for the worst case hydrologic conditions <br />under two distinct mining time frames. The first set of SEDCAD models, which were developed as part <br />of TR -105 described in more detail below, present the conditions when the majority of the watershed is <br />intercepted by the active pit, but the reclaimed lands closest to the sediment pond are in the early stages of <br />revegetation. The second set, developed pursuant to TR -105, describes the conditions upon completion of <br />mining with the majority of the disturbed portions of the watershed now with several years of vegetation <br />growth, but the entire watershed reporting to the pond. At this stage the most recent reclamation at the <br />headwaters of the watershed is in the early stage of reclamation, that is, 1-2 year growth. In each case, the <br />first SEDCAD run provides the results of the 10 year, 24 hour design storm and demonstrates the system <br />will meet the applicable settleable solids standard. The second model run in each case demonstrates that <br />the sediment pond's emergency spillway is capable of safely passing the spillway design flood, in this <br />case the 25 year, 24 hour storm. <br />Revisions Pursuant to TR -105 <br />The final postmining topographic surface associated with TR -105 and the final locations of the permanent <br />drainage channels as presented on Map 41A were used to model the watershed for the post -mining <br />condition. Two in -stream stock tanks were included in the permanent drainage channels (West Taylor <br />West Tributary and West Taylor East Tributary) to maximize the sediment control as the reclaimed <br />watershed progresses toward bond release. These stock tanks will be constructed as the final grading of <br />the reclaimed lands and construction of the channels proceeds to the south. These stock tanks will be <br />constructed in accordance with design requirements shown on Figure 2.05-6 in Volume 1. <br />The following pages present the SEDCAD computer runs for the above described two distinct mining <br />phases. Two design storms were evaluated for the active mining case; a 10 year/24 hour storm to assess <br />expected effluent quality, and a 25 year/24 hour storm to assess the capacity of the emergency spillway to <br />safely discharge the design storm. The 10 year/24 hour storm was also evaluated for the post mining case <br />to assess expected effluent quality. <br />Runoff Curve numbers assigned to the undisturbed and reclaimed lands in various stages of reclamation <br />have been selected in accordance with Table 1 in the Introductory Text for Exhibit 7 (Vol. 2D). Soil <br />erodibility factors and other parameters used in estimating sediment concentration in runoff are also <br />drawn from that exhibit. <br />For the intermediate (active mining) scenario, with approximately 70% of the watershed intercepted by <br />the active mine pit, the 10 year, 24 hour storm produces 3.4 acre feet of runoff at the West Taylor <br />Sedimentation pond. As summarized in Table 4, peak reservoir stage while passing this storm is at <br />elevation 7471.74, about 0.74 feet above the overflow of the primary (drop inlet) spillway and 4.26 feet <br />below the invert of the emergency spillway. Settleable solids released from the pond in the downstream <br />Exh. 7-20C-1 Revision Date: 06/15/15 <br />Revision No.: TR -105 <br />