Laserfiche WebLink
Exhibit 7, Item 14, Table 1 <br />Summary of Ditch and Channel Design Parameters <br />cy_ <br />Taylor Road DliGch <br />ROOM <br />Rlp Rap.' <br />r <br />P@ICllali0llt <br />Flow, Q <br />Slopk % <br />Width, <br />HAV <br />ON, In <br />t <br />X <br />LU <br />Ditch, Sta 0 to 46 <br />10.1 <br />8 <br />(V ditch) <br />3.0 <br />in rock <br />ecOom <br />Silo flops. <br />Rip Rap. <br />Ent Pit Reclamation Area <br />Flow, Q <br />Slope, % <br />WMth <br />HAV <br />050, In <br />Prospect Ditch Reach 1 to Sta 1+50 <br />10.0 <br />10.7 <br />12 <br />2 <br />n/a; veg. <br />t <br />Prospect Ditch, Sta 1+50 to PD -1 <br />4.4 <br />28.2 <br />12 <br />2 <br />n/a; veg. <br />LU <br />Prospect Ditch, above Pond PD -1 <br />4.1 <br />12-15 <br />12 <br />2 <br />n/a; veg. <br />N. Trib. East Pit Ditch Reach 1 <br />10.2 <br />21 <br />12 <br />2 <br />n/a; veg. <br />N. Trib. East Pit Ditch Reach 2 <br />11.9 <br />10- 13 <br />12 <br />2 <br />6 <br />Final East Pit Ditch all 3 Reaches <br />5.9-27.2 <br />4-16.8 <br />12 <br />2 <br />6 <br />Combined NTEP/Final E Pit Ditch <br />35.4 <br />24 <br />12 <br />2 <br />9 <br />Note: For ditches in the South Taylor Area, See Volume 13, Table 1, Exh. 7-20 Part E. (This includes <br />the following Ditches <br />West Taylor East Tributary Ditch <br />West Taylor West Tributary Ditch <br />S29 -A Trib <br />Trib. A Ditch <br />Trib. C Ditch <br />Trib. D Ditch <br />Trib. F Ditch <br />Trib. G Ditch <br />Trib. H Ditch <br />Trib. I Ditch <br />Exh. 7-14-8 <br />Revision Date: 8/22/15 <br />Revision No. TR -105 <br />