My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-16_INSPECTION - M1974069
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1974069
>
2015-10-16_INSPECTION - M1974069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:44 PM
Creation date
10/20/2015 9:13:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974069
IBM Index Class Name
INSPECTION
Doc Date
10/16/2015
Doc Name
Corrective Action Response
From
Loveland Ready Mix
To
DRMS
Inspection Date
10/13/2015
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Larimer Pits Plant SPCC Plan <br />Spill Prevention Control and <br />Countermeasure Plan <br />Larimer Pits Plant <br />644 N. County Road 19E <br />Loveland, Colorado 80537 <br />Original Date of this Plan: November 1, 2013 <br />Date of Last Plan Amendment/P.E. Certification: <br />Date of Last Plan Review: <br />Designated person accountable for spill prevention: <br />Brad Fancher — VP Operations Cell: 970-214-6294 Office: 970-667-1108 <br />ENGINEER CERTIFICATION <br />I hereby certify that: i) I am familiar with the requirements of the SPCC Rule (40 CFR part 112), ii) I or my agent has <br />visited the facility, iii) this SPCC Plan has been prepared in accordance with good engineering practice including <br />consideration of applicable industry standards, and with the requirements of the SPCC Rule, iv) procedures for the <br />required inspections and testing have been established, v) this SPCC Plan is adequate for the facility, and vi) that, if <br />applicable, for a produced water container subject to § 112.9(c)(6), any procedure to minimize the amount of free - <br />phase oil is designed to reduce the accumulation of free -phase oil and the procedures and frequency for required <br />inspections, maintenance and testing have been established and are described in the Plan. <br />Engineer: John Jankousky, P.E. Colorado Registration Number: 30941 <br />November 1, 2013 <br />NOTICE <br />The statements in this document are intended solely as guidance. This document is not intended and cannot be relied <br />upon to create rights, substantive or procedural, enforceable by any party in litigation with the United States. <br />Latimer Pit Plant SPCC Plan -November 2013.doe ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.