My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-16_HYDROLOGY - M2007044
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2007044
>
2015-10-16_HYDROLOGY - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:44 PM
Creation date
10/20/2015 9:09:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
HYDROLOGY
Doc Date
10/16/2015
Doc Name
3rd Qtr. Hydrology Report, 2015
From
EF Energy Fuels
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tCharacterization of mine water in the Packrat Mine could not be conducted because the mine is <br />not yet accessible. Appendix 1, Attachment 3 of this report is reserved for field data collected <br />from the Packrat Mine at such time that it becomes accessible and is monitored. <br />DP Spring <br />' The fieldaram t r <br />p e e s were measured at DP Spring on August 5, 2015. The flow is measured by <br />' timing the fill rate of a five -gallon bucket. Field parameters from DP Spring are measured in the <br />stock tank located at the spring. The field sampling form is provided in Appendix 3. A sample <br />and a duplicate (referred to as Bear Spring) from DP Spring were inadvertently collected during <br />' the 2015 annual sampling event. While not required, the data are included in Appendix 5 for <br />informational purposes only. <br />' Flow rates and field parameters at DP Spring are summarized in Appendix 1, Attachment 4. <br />PR Spring <br />' The field parameters were measured at PR Spring on August 5, 2015. The flow is measured by <br />timing the fill rate of a five -gallon bucket. Field parameters from PR Spring are measured in the <br />' stock tank located at the spring. The field sampling form is provided in Appendix 3. <br />Flow rates and field parameters at PR Spring are summarized in Appendix 1, Attachment 5. <br />' Results from the 2015 annual sampling event, along with the historical analytical data from PR <br />Spring are summarized in Appendix 2, Table 2. <br />Monitoring Well W-1 <br />Monitoring Well W-1 was installed on October 12, 2008 for the purpose of characterizing and <br />' monitoring groundwater quality downgradient of the waste rock storage area. Monitoring Well <br />W-1 was measured for the static groundwater level and field parameters on August 5, 2015. The <br />water level at Monitoring Well W-1 is consistent with previous measurements. The field <br />tsampling form is provided in Appendix 3. <br />Water levels and field parameters are summarized in Appendix 1, Attachment 6. Results from <br />' the 2015 annual sampling event, along with the historical analytical data from Monitoring Well <br />W-1 are summarized in Appendix 2, Table 3. <br />I <br />Lumsden Canyon See <br />The Lumsden Canyon Seep (also referred to in earlier reports as Lumsden Canyon Spring) was <br />' monitored for field parameters and sampled in June and December of 2008. This location was <br />monitored by Western Water & Land, Inc. during hydrologic reconnaissance required by BLM <br />stipulations to the Plan of Operations. No further sampling or field parameter measurement <br />' events are scheduled at this time. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.