Laserfiche WebLink
Page 4 of 5 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />Is adequate topsoil reserved for reclamation, based on your approved permit? <br />Total acres Total acres Total acres <br />Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />backfilled: seeded w/ w/topsoil mulched w/ 10 <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? F NO N/A <br />approved mix: <br />Are all hazardous materials stored within approved spill containment structures? <br />replaced: <br />18. <br />approved mulch: <br />E NO N/A <br />Total acres <br />Is your basis for legal right to enter still valid? <br />Total acres <br />20. <br />Topsoil <br />NO N/A <br />Mulch application <br />If "Yes", please attach the required moAn'iton' <br />y <br />results to this Annual Report. <br />graded: fertilized w/ o replacement Z rate (tons/ac): N/a <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />apvd fertilizer: depth (in.): <br />Seed Fertilizer Mulch <br />application <br />I <br />application <br />n _ <br />T <br />application N % I <br />method: method: method: <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? E NO N/A <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? NO N/A <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? NO N/A <br />If "NO" please explain: <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? F NO N/A <br />17. Are all hazardous materials stored within approved spill containment structures? NO N/A <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? E NO N/A <br />19. Is your basis for legal right to enter still valid? ES NO <br />20. Does your permit require you to submit monitoring information annually? NO N/A <br />If "Yes", please attach the required moAn'iton' <br />y <br />results to this Annual Report. <br />Y o G(t S -k rvj G 4+ + t S ''I l <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: yj G)