My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-16_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2015-10-16_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:44 PM
Creation date
10/16/2015 2:39:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/16/2015
Doc Name
Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR166
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: MR 166 Cost Summary <br />Site: Deserado Mine Permit Action: MR 166 <br />PROJECT IDENTIFICATION <br />Task #: MR16600 State: Colorado <br />Date: 10/16/2015 County: Moffat <br />User: CCW <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1981018 <br />Abbreviation: None <br />Filename: C018-MR16600 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />MR16 <br />Backfill SDH -3 Dewatering Treatment System <br />DOZER <br />1 <br />1.97 <br />$535.00 <br />601 <br />10.00 <br />Total = <br />$172.60 <br />Total = <br />$0.00 <br />MR16 <br />1 <br />$406.00 <br />Replace Topsoil to Dewatering Treatment System <br />DOZER <br />1.50 <br />602 <br />MR16 <br />1 <br />$785.00 <br />Reseed SDH -3 Dewatering Treatment System <br />REVEGE I <br />1.00 <br />603 <br />SUBTOTALS: <br />4.47 <br />$1,726 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />$34.87 <br />Performance bond: <br />1.05 <br />Total = <br />$18.12 <br />Job superintendent: <br />2.24 <br />Total = <br />$167.98 <br />Profit: <br />10.00 <br />Total = <br />$172.60 <br />Total = <br />$0.00 <br />TOTAL O & P = <br />$393.57 <br />TOTAL INDIRECT COST = <br />CONTRACT AMOUNT (direct + O & P) = <br />$2,119.57 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />4.61 <br />Total = <br />$97.71 <br />Reclamation management and/or administration: <br />3.58 <br />$75.88 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$567.16 <br />TOTAL BOND AMOUNT (direct + indirect) = $2,293.16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.